Loading...
Mercantile-CS040406April 6, 2004 Darryl Miller Pacific Builders 3360 Wiley Post Rd, Ste 100 Carrollton TX 75006 T H E C I T Y O F Fax: 972-866-9090 RE: Mercantile Addition, Phase 1 Final Acceptance Conditions Fourth Notice Dear Mr. Miller: It appears that all punchlist items on the above captioned project have been completed. We have received the maintenance bond from Huffman & Huffman for water and sewer improvements. The preliminary as-built drawings for the project have been received from Doxvdey, Anderson & Associates. The maintenance bond for paving improvements is still outstanding as of this date. If the contractor is having difficulty obtaining a bond from a registered surety, the City of Coppell may be willing to accept a cash bond (certified cashiers check) in lieu of a surety bond. Please make every effort to see that we are provided this final requirement as soon as possible. Once the paving bond is received, reviewed and accepted I will sign off on the CO and send a final acceptance letter. The maintenance period begins on the date ofthefinal acceptance letter. If you have any questions, please call me at 972/304-3679. Sincerely, Rick O'Dell Construction Inspector Office Phone: 972/304-7090 Fax: 972/304-3570 CC; Kenneth M. Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Jennifer Armstrong, Finance Director - o7q 255 PARK%¥A¥ * PO BOX 9478 * COPPELL. TX 75OI9 %, IlL 972'462 OO22 ,Jr FAX 972/304 3673