Loading...
ST9302-CS 970114January 14, 1997 Greg Saunders, P.E. Rady & Associates, Inc. 910 Collier Street Fort Worth, TX 76102 RE:: Sandy Lake Road ST 93-02 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Dear Mr. Saunders: Enclosed is the information you requested at our December 19, 1996 meeting in your office. That information includes: A hard copy of a set of typical specifications. A diskette with a copy of a set of standard specifications in Word Perfect 5.0 format. A preliminary water and sewer plan sheet showing proposed water taps on Sandy Lake Road. Also, the plan sheet shows that the shopping center sanitary sewer line will run to the north. Copies of as-built plans for Kroger at the northwest comer of Sandy Lake Road and MacArthur Blvd. (including a copy of the plat, dimensional control plan, grading plans, drainage map and calculation sheets). If you need additional information please contact me. The City is still waiting to receive as-built plans from the engineer of the Ashton Ridge development. As soon as those are receive, then I will mail you a copy of the plat and grading plans. If you need any additional information concermng any other developments along Sandy Lake Road please contact me at (972) 304-3681. Sincerely, Michael A. Martin, E.I.T. Assistant City Engineer TOHCS OF DISCUSSION SANDY LAKE ROAD CITY OF COPPELL December 19, 1996 External Consultant Coordination Sverdmp ~fiannon Hebb) a. Kroger Drives b. Water Line Construction !USA (scott Young)( a. Limits of Design b. Storm Sewer c. Status Shimeck Jacobs and Finklea (MaR Hickey)4-C,r~ i~,,J~;,Jcj a. 36" Water Line Construction Right-of-Way Documents a. Deliverable .b. Status of Acquisition Retaining Wall System Options a. Drilled Shaft ~,,. b. Spread Footing // Signal/Conduit Layout Horizontal Layout of DWU's 30" Water Line a. KIIA set up meeting with DWU b. Continue with profile after City's and DWU's feedback Monthly Project Status Meetings (L~sV Tentative Project Schedule a. Send Remaining R.O.W. exhibits to City b. Submit 95% to Cit c. City Review ~ d. Submit 100% Plans and Bid Documents to City e. City Review (2 weeks) f. Issue for Bid 1/24/97 2/28/97 ') 3/3 - 3/31/97 4/18/97 4/21 - 5/2/97 5/16/97