Loading...
Sandy Lk Addn L3-CS040401DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM Sandy Lake Addition~ Lot 3~ Block A (McAnelly): Site Plan, to allow the construction of an approximate 4,800-square-foot medical office, Phase One being 3,572-square feet and 1,228-square feet in Phase 2, on 0.83 of an acre of property located along the north side of Sandy Lake Road, approximately 400 feet west of Samuel Boulevard, at the request of Skip Blake, Blake Architects. STAFF REP.: Marcie Diamond PROJECT ID//SPA-04-0009 DRC DA TE: March 25, 2004 and April 1, 2004 CONTACT: Ken Gri~n, P.E., Dir. O[En~ineerin~ & Public ~Vorks (972)304-3686 COMMENT STATUS: ] ~eF, l:J~rp64~$ ,/FINAL RE!'?SED 1. Remove the existing clean-out and construct a manhole in its place, or tie into the existing line downstream of the clean-out. Do not "tap" the existing clean-out. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Sandy Lake Addition~ Lot 3~ Block A (McAnelly)~ Minor Plat~ to allow the construction of an approximate 4,800-square-foot medical office, Phase One being 3,572-square feet and 1,228-square feet in Phase 2, on 0.83 of an acre of property located along thc north side of Sandy Lake Road, approximately 400 feet west of Samuel Boulevard, at the request of Skip Blake, Blake Architects. STAFF REP.: Marcie Diamond PROJECT ID0 MP-04-0010 DRC DATE: March 25, 2004 and.4pril 1, 2004 CONTACT: Ken Gri~n, P.E., Dir. o[En~ineerin~ & Public Works (972)304-3686 COMMENT STATUS: ~4JM~N, CRg ,~FINAL P.E!~£ED 1. Additional comments maybe generated during review of full engineering plans.