Sandy Lk Addn L3-CS040325DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
[TEM
Sandy Lake Additlnn~ Lot 3~ Block A (McAnelly)~ Site Plan, to allow
the construction of an approximate 4,800-square-foot medical office,
Phase One being 3,572-square feet and 1,228-square feet in Phase 2, on
0.83 of an acre of property located along the north side of Sandy Lake
Road, approximately 400 feet west of Samuel Boulevard, at the request
of Skip Blake, Blake Architects.
STAFF REP.: Marcie Diamond PROJECT ID//SPA-04-0009
DR C DA TE: March 25, 2004 and April 1, 2004
CONTACT: Ken Gri~n, P.E., Dir. O~ En~ineerin~ & Public Works (972)304-3686
COMMENT STATUS: ,/PRELIMINARY FINA£ ~
1. Remove the existing clean-out and construct a manhole in its place, or tie into the existing
line downstream of the clean-out. Do not "tap" the existing clean-out.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Sandy Lake Addition~ Lot 3~ Block A (McAnelly)~ Minor Platt to
allow the construction of an approximate 4,800-square-foot medical
office, Phase One being 3,572-square feet and 1,228-square feet in Phase
2, on 0.83 of an acre of property located along the north side of Sandy
Lake Road, approximately 400 feet west of Samuel Boulevard, at the
request of Skip Blake, Blake Architects.
STAFF REP.: Marcie Diamond PROJECT ID# MP-04-0010
DRC DA TE: March 25, 2004 and April I, 2004
CONTACT: Ken Gri~n, P.E., Dir. of En~ineerin~ & Public Works (972)304-3686~
COMMENTSTATUS: ,/PRELIMINARY F!P,~L I ~
I
1. Remove the contours from the plat documents.
2. Remove the note about trees from the plat document.
3. What is the intended purpose of the "Utility Plat" document?
4. Provide preliminary drainage plans for eng/neering review.
5. Extend the 20' utility easement onto this lot to cover the existing sewer line.
6. Additional comments may be generated after review of engineering plans.