Loading...
ST9302-CS 970128January 28, 1997 City of Dallas O?'31-979PO3925-Ni Paul M. Hanes, P.E. Project Manager Kimley-Horn and Associates, Inc. 910 Collier Street Fort Worth, Texas 76102 Sandy Lake Road from Denton Tap To MacArthur Blvd. Review Comments for 30" RC Water Design My staff has reviewed your preliminary plans showing proposed alignments for the 30" water transmission- Our comments are as follows: 1.) The profile for the 30" DWU Water main coincides with Coppell's 36" water. Provide a separate profile for the 30" main. 2.) Maintain a minimum cover of 6 Ft. for the proposed 30" main throughout the paving limit. 3.) The proposed 30" main must clear all utility crossings a minimum vertical clearance of 0.50 Ft. 4.) Use grade breaks or vertical curves in lieu of vertical bends, in particular at sta. 6+50 to 7+75. 5.) Limit the extent of water main replacement within the proposed pavement. Make connections to the existing main 5 Ft. off paving limits. We are returning your preliminary half-size plan marked with comments. Please provide us with a cost estimate to construct the 30" Water main to update our funding for this project. Also, we are supplying you the enclosed copy of DWU plan 41iQ308D Sh. 1,3,4 r~ 14 of our Maple ~venue project~ showing in particular the relocation of a 36" water main for your reference. Please call me or Jun Battad at tel. 918-4591 if you have any questions. Brian H. Cowan, P.E. Project Manager Relocations/Dart Attachment c:.~.~if~-:eoppell.~ J. Milstead, J. Battad, File 97028AB1 Water Utilities Department Development Services ® 320 E. Jefferson, Room 218 · Dallas, Texas 75203 · 214 / 948-4590 A city utility providing regional water and wastewater services vital to public health and safety.