Loading...
Coppell Comm 1R3-CS0404053E Aph15,2004 J 0 N ES & C A RTE RiNC. ENGINEERS.PLANNERS'SURVEYORS 3030 LBJ Freeway, Suite Dallas, Texas 75234-7747 TEL 972 388 4880 FAX 972 488 3882 AUSTIN DALLAS HOUSTON THEWOODLANDS Mr. Keith R. Marvin, P.E. Civil Engineer City of Coppell 255 Parkway Coppell, Texas 75019 Re: Royal Park, Coppell Commerce Center, Lot 1R Block 3 Construction Plan Review Comments Response Coppell, Texas Dear Mr. Marvin: Pursuant to your letter dated March 23, 2004, please accept this letter as a formal response to plan comments: Dimension Control Plan 1. Using turning templates for a 19' vehicle with a 11' wheel base and a 7' track, the 5-foot area is sufficient for backing out of the most northwesterly parking space. Drainage Plan 1. Plans have been reviewed and approved by Mr. Glenn Celerier, P.E. of ACT 21 in a design review meeting and have been submitted to DART to finalize the license agreement. Upon receipt, Jones & Carter will provide a file copy to the City of Coppell. 2. The 514.00 contour has been modified to reduce the area of parking lot/fire lane inundation. Please note that this inundation will only be during the 100-year event and that the depth will be approximately 3-inches. 3. The following notes have been added to the drainage plan: (1) Contractor shall repair pavement throughout the extent of the gutter transition and pavement depression when relocating existing inlet. (2) Contractor shall provide continuous concrete curb in area of relocated inlet. (3) Contractor shall provide appropriate gutter and pavement transition to insure flow into proposed recessed inlet. (4) Within public right-of-way, Contractor shall replace existing concrete to City of Coppell standards. (5) When performing saw-cut operations, if the proposed cut line falls within 4-feet of an existing joint line, Contractor shall move cut line to said joint. 4. As stated previously, there is not sufficient information to determine the exact flow area. In review of City of Coppell and DART record drawings, no information regarding the existing 27" RCP could be found. Also, no information could be found in a review of the adjacent development plans. Utility Plan 1. The referenced line work has been removed. 2. The comments on said sheet have been addressed. Smart Engineering. Smart Solutions." www.jonescarter, com Mr. Keith R. Marvin, P.E. April 5, 2004 Page 2 Enclosed are the required marked up set of drawings and three (3) revised sets. At this time, it is unclear the number of sets that the contractor will require. Upon receipt of this information, Jones & Caner will submit additional copies to your attention for stamping. Also, the contractor will be remitting payment of the required fees under separate cover. If you have any questions or wish to discuss these comments further, please call. Sincerely, ~son R. Elms, P.E. Project Manager JRE/je lSProjects~J&CDallasXPritchard Associates (D076)\002 Bums & Freeport~Leiter~planresponse4-5-04.DOC cc: Brett Ratliff, Pritchard Associates, Inc.