CiCi's Addition-CS040407 T H E C I T Y 0 F
C-O15P-gLL
FROM THE
DEPARTMENT OF ENGINEERING
~er. ation_s Manager
Ted Dutt, Utilities Operations Supervisor
From: Larry Davis, Constmction Inspector ~/~
Office Phone: (972) 304-3684
Fax: (972) 304-3570
Date:
RE:
April 7, 2004
WALK-THRU for SBC conduit installation Royal Ln ~ Bethel Rd
CC:
A walk-thru for the referenced project has been scheduled for:
Friday, April 9th at 9:00 a.m.
Please let me know ifI can be of further assistance.
Keith Marvin, P.E.
Suzan Taylor, CIP Coordinator
Lisa Cantu, SBC Communications
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"