Loading...
WA9701-CS040414April 14, 2004 COFFELL Gary Hendricks, P.E. Birkhoff, Hendricks & Conway, L.L.P. 7502 Greenville Avenue, #220 Dallas, Texas 75231 RE: Belt Line Rd./Denton Tap Rd. Water Line (from Bethel Rd. to Airline Dr.) WA 97-01 Dear Mr. Hendricks: I recently received Invoice #0001328 dated April 7, 2004 requesting a payment of $209.58. What caught my attention on this invoice was that it showed that all monies for the design contract were being paid with this invoice and actually a credit was being provided on the invoice to keep the total amount invoiced at the contract amount. Because I was aware that the design is not complete, I audited the financial aspect of this project. I am somewhat concerned. The City of Coppell entered into a contract with your firm on April 12, 2002 for the design of the Belt Line/Denton Tap Water Line (from Bethel Rd. to Airline Drive) in an amount not to exceed $57,240. That total amount was divided into two sections. The Basic Services section, in an amount of $38,500, was divided into three phases: 1) Design Phase at $30,800; 2) Bidding Phase at $1,925; and 3) Construction Phase at $5,775. The Special Services section, in an amount of$18,700, xvas divided into six phases: I) Design Surveys for $7,680; 2) Construction Surveys for $1,800; 3) Boundary Surveys for $960; 4) Preparation of Easement Documents for $4,000; 5) Printing of Final Plans and Specifications for $1,800; and 6) Geotechnical Evaluation for $2,500. The first invoice on this project was dated September 30, 2002. To date there have been nine invoices of which the City has paid and four invoices of which the City has not paid. My audit of the invoices paid is as follows: Design Survey - $7,680 To date the City has paid $13,955.72 for two line items, one entitled Design Survey and one entitled Field Notes and Plat. (Because no easement documents have been prepared, I'm ssuming the F~eld Notes and Plat" is part of the design survey.) 2. Construction Surveys - $1,800 The City has not paid, nor been invoiced on any items. 3. Boundary Survey- $960 The City has not paid, nor been invoiced on any items. 4. Preparation of Easement Documents - $4,000 The City has not paid, nor been invoiced on any items. 5. Printing of Final Plans - $1,800 The City has paid $821.02; and been invoiced an additional $221. 6. Geotechnical Evaluation ~ $2,500 The City has not paid, nor been invoiced on any items. When you total the amount the City has paid for Special Services it is $14,776.74. This is somewhat troublesome given the fact that the construction survey, boundary survey, preparation of easements documents and geotechnical evaluation totals an additional $9,260. Also, the City has been invoiced an additional $221 for printing. Therefore, the total amount outstanding under Special Services is $9,481. When this is added to the amount already paid under Special Services it brings Special Services to a total of $24,257.74. This is obviously outside the bounds of the contract amount for Special Services. Another point of concern under Special Services is the inclusion of printing under Special Services. The contract clearly states under Basic Services, design phase, that the preliminary plans and specifications will be printed for review by the City and the utility companies. The $l,800 assigned for printing, under Professional Services very clearly states that this is printing of final plans and specifications for distribution to perspective bidders and the successful contractor. Therefore, it is my opinion that all costs for printing up to the printlng of the final plans is an included item under Basic Services and should not have been billed separately. This amounts to $821.02 already paid and an additional $221 invoiced but not paid for a total amount of printing of $1,042.02, which should have been included under Basic Services. This brings me to another concern. The invoices show that Basic Services was 100% complete on the November 10, 2003 invoice in an amount of $30,800. However, based on the last invoice on this project there is no money left in this project for the other two components of Basic Services which are Bidding and Construction phases. Those two components of Basic Services total $7,700, again of which there is no money left in the contract to pay. In reviewing the invoices, I also noted that beginning with the November 10, 2003 invoice an item entitled "Redesign" began appearing on the invoices. To date, the City has paid $3,636.42 for redesign and has been invoiced an additional $7,852.65 for a total amount for redesign of $11,489.07. It was my understanding that the redesign was being handled under the original contact, but obviously that is not the case. Very clearly, if there was going to be additional charges for the redesign that should have been handled under a change order to the original design contract. Before the invoices from January 21, 2004 through April 7, 2004 are processed by the City several things need to take place. 1. An amendment to the contract needs to be provided for the cost of the redesign. 2. The printing charged under Special Services should be removed and be included as part of the Basic Services. 3. There needs to be some detailing of how this project design will be completed, given the fact that almost all the monies associated with the Special Services has already been paid when there is still $9,260 of identified items, under Special Services, which have not been paid nor invoiced. 4. There needs to be some detailing of how the bidding and construction phase will be completed when all monies on the project have already been spent and there is still $7,700 associated with those two items in Basic Services. I would appreciate a timely resolution to this letter and the invoices on the project so that we can move ahead to the completion of design and bidding on this project. If you should have any questions please contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering / Public Works Office 972/304-3686 Fax 972/304-7041 E-mail