Loading...
ST9902-CS040419coP?EEL Apfil19,2004 Mr. Michael A. Jones, P.E. Teague, Nalland Perkins, Inc. ll00Macon Street Fo~Worth, Texas76102 West Sandy Lake Road ST 99-02 Dear Mr. Jones: This letter is written as a follow-up to our meeting on April 15, 2004 concerning waterline improvements in West Sandy Lake Road. After reviewing your proposal and the Sandy Lake Road Waterline Plan for the 24" line constructed in 1998, and after discussion with my Utility Department, the decision has been made to take the 10" waterline out of service from Northpoint Drive east to Coppell Road North. To accomplish that, the following items need to be completed: The 10" waterline needs to be cut and plugged east of where the 12" waterline in Northpoint ties into the existing 12" waterline at Sandy Lake Road. You should show the existing 12" line on the west side of Northpoint Dr. that ties into the existing 12" in Sandy Lake. If you do not have those plans, please let me know and they can be provided to you. 2. Show an 8" stub offthe 24" waterline to the north at approximately Sta 26+25. 3. Show an 8" stub off the 24" waterline to the north at approximately Sta 38+50. Show the existing 12" stubouts, both north and south, on the west side of State Road at approximately Sta 42+25. You need to ensure that both of the existing stubouts are extended adequately to be out from under the proposed paving. 5. You need to disconnect the existing 12" waterline to the north at approximately Sta 42+45 and reconnect it to the existing 12" stubout to the north at approximately Sta 42+25. 6. You need to disconnect the existing 10" service line to the church at approximately Sta 46+80 and reconnect it to the existing 24" waterline. 7. You need to cut and plug the 8" waterline in Oakbend at approximately Sta 48+30 north of the existing 8" connection to the existing 24" waterline. You need to cut and plug the 8" waterline in Branchwood at approximately Sta 52+30 north of the existing 8" co~mection to the existing 24" waterline. That location is generally near the back-of-curb in the east radius of Branchwood. In addition to the above items that need to be accomplished to take the existing 10" out of service, the following two items also need to be shown as part of the construction of this project: 1. You need to provide an 8" waterline stubout to the north from the existing I2" waterline at approximately Sta 17+50. 2. You need to move the proposed 8" waterline stubout to the north from approximately Sta 21 +90 to approximately Sta 26+30. In reviewing these plans further with my Utility Department, it is highly likely that we will also attempt to remove the existing 8" waterline from Coppell Road North to Denton Tap Road during the construction of the east portion of West Sandy Lake Road. With the construction of the 24" waterline in 1998, several stubouts and connections were made to adjacent subdivisions to allow the City to take the existing 8" waterline out of service. If you have any questions or need any additional information, or if you need to be provided any construction plans related to the above matters, please let me know. Sincerely, Ken Griffin, P.E., Director of Engineering & Public Works Office: 972/304-3686 Fax: 972/304-7041 kgri ffin~ci.coppell.tx.us 2