Loading...
Mercantile-CS040315cOPPEL£ March 15, 2004 Darryl Miller Pacific Builders 3360 Wiley Post Rd, Ste 100 Carrollton TX 75006 RE: Mercantile Addition, Phase 1 Final Acceptance Conditions - Second Notice Dear Mr. Miller: On March 1, 2004 a letter containing two conditions for final acceptance for the referenced project was sent to .','our office. It appears that all punchlist items have been completed, yet these two items remain. Again, the requirements for sign-offon the CO are as follow: 1. Provide a maintenance bond from a registered surety for 50% of the contract value of work performed in the public fight-of-way and easements for a 2-year period beginning on the date of final acceptance. 2. Provide record drawings of the public improvements from the engineer to be submitted to City of Coppell Engineering Dept. Once these items have been received, reviewed and accepted, I will sign offon the CO and send a final acceptance letter. If you have any questions, please call me at 972/304-3679. Sincerely, Rick O Dell Construction Inspector Office Phone: 972/304-7090 Fax: 972/304-3570 CC] Kenneth M. Griffin, P.E., Director of Engineenng & Public Works GIe~m Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Vernon Gilmore, Acting Fire Marshal