Loading...
ST9304-CS00012415:~8 FAX 2147~97085~ HALFF ASSOCIATES REPLY TO ATYFNTION O; Bnvh-onmental Div~on Ke~d~to~y Brauch DEPARTMENT OF THE ARMY FORT WORTH DISTRICT, CORPS OF ENGINEERS P.O. BOX 17300 FORT WORTH. TEXAS 76102-0300 SUBJECT: l~o~ect Number 200000046 ~002/007 Dear Mr. Furlong: Thsak you for your letter dated January 12, 2000. Your request has been assigned Project Number 2~. ...Mr. David Madden has been assisned as the resulatory project manager for your request and vdil'be evaluating it as expeditiously as pom'ole. However, because of our permit workload it will take a while for us to respond. we are enclo~ guidance on submittals and mitigation that may help you prepare future requests or supplemem your current request. KY°u have any questions about the evaluation of your reque~ please contact Mr. David l~L.sdde~ nI the address above or telephone ($17)978-4622 sod refer to your n~si!p~d project number. Pl~ase note that it is un~wfi~ to start work -o,~,hout a .D~partment ofthe Army permit ii' one is required. Wa!me A. Lea · ,, Halff Associates ENGINEERS · ARCHTrECTS · SCIENTISTS PLANNERS · SURVEYORS Mr. Wayne Lea Chief- Regulatory Branch U.S. Army Corps of Engineers Southwest Region, EV-R P.O. Box 17300 Fort Worth, Texas 76102-0300 8616 NORTHWEST PLAZA DRIVE DALLAS, TEXAS 75225 (214) 346-6200 FAX (214) 739-0095 January 12, 2000 AVO #14111SS Re: Bridge Improvements - Beltline Road ~ Grapevine Creek, Dallas County, Texas Pre-construction Notification Dear Sir: Dallas county is in the process of completing construction documents for a major arterial road, Beltline Road from MacA_rthur Blvd. to Denton Tap Road in north Dallas County. The existing route crosses Grapevine Creek. A divided four-lane bridge expandable to six lanes would replace the existing two-lane bridge with concrete riprap protecting the bridge abutments. The attached drawings show the extent of proposed work in the channel. Approximately, 200 linear feet of channel would be affected. Appropriate erosion controls will be constructed prior to any work activity in the main channel. A waterline crossing just north of the bridge structure will also be required in the Grapevine Creek bottom to allow for the construction of the bridge piers. From discussions with Mr. Dave Martin, in the Regulatory Branch, his suggestion was that we notify the Corps of Engineers of our proposed construction activity in the channel. It is our client's, Dallas County, desire to begin construction within the next two months. If there is any 404 permit provisions to satisfy at this time we would like to be fully informed of these. Mr. Martin was of the opinion we might be able to comply under Section 14 of the 404 permit requirements for road crossings. Your attention to this matter at your earliest convenience is greatly appreciated. have any questions, please contact us at (214) 346-6205. Thank you. If you Cc: John Mears, P.E. Files Attachments Very truly yours, HAL~c. 'Jo~ ~q. Furlong, I~. DALLAS · FORT WORTH · HOUSTON · McALLEN TRANSPORTATION · WATER RESOURCES · LAND DEVELOPMENT ° MUNICIPAL · ENVIRONMENTAL ° sTRUCTURAL MECHANICAL · ELECTRICAL · SURVEYING · GEOGRAPHIC INFORMATION SYSTEMS ARCHITECTURE · LANDSCAPE ARCHITECTURE · PLANNING ...... Done. Bridge Plans I. Fill in all statio~Offsets, elevations, and incomplete tables. Done. 2. Provide grading plans for channel, and submit to this office as soon as possible. See Comment No. 3. This was submitted in October, 1998. -~' 3. Is a COE permit required for this project? From previous correspondence it is our understanding a COE 404 permit is not required. 4. Show utilities on bridge plan and section view. Done. 5. Conf'u-m that depth of drilled shafts conform to data and recommendations in geotechnical investigation. The geotechnical recommendations were followed. 6, Verify the grades and typical sections match roadway plans. These were checked. 7. Show survey control to layout wingwalls and skews. There is sufficient detail to construct wingwalls and skew from the plans. 8. Clarify diameter and layout of all drilled shafts. These were clarified. 9. Provide all critical abutment, bent, etc., elevations. These have been provided. RO. Box 478 Coppell, Texas 75019 972-462-0022 January5, 2000 Mr. Jim Cullar Evaluation Associates 11615 Forest Central Drive, Suite 205 Dallas, Texas 75243-3917 RE: Belt Line Road Project//ST 93-04 / Appraisal Services Dear Mr. Cullar: I have received your invoice for professional services related to appraisals associated with Parcels 12SE and 12DE in connection with the Belt Line Road project. That invoice has been processed, however there may have been some confusion in our prior meeting as to the scope of the services requested from you by the City of Coppell. Because several portions of the Crow-Billingsley property lies within Coppell and the City of Dallas, it was discussed with Dallas County that Coppell would provide the appraisal services for all the property owned by Crow-Billingsley and make the offer to Crow-Billingsley for the acquisition of all of the property. Dallas County would then reimburse the City for the value of the property acquired that lies within the City of Dallas. I need a report that covers not only Parcels 12SE and 12DE, but also the following parcels: 8SE; 8DE-l; 8DE-2; 10SE; and llSE. In addition, I need a Proposal for Appraisal Services so that a financial account can be setup for payment on this project. Provided with this letter is all backup information from Dallas County concerning those additional parcels. Any assistance that you can provide in expediting the appraisal reports back to the City of Coppell will be greatly appreciated. This will enable us to begin negotiations with Crow-Billingsley representatives to obtain the necessary easements so that construction can begin hopefully in the first quarter of 2000. If you should have any questions or need any additional information please feel free to call me. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works cc: John Mears P.E., Dallas County