Coppell/121 Off Pk-CS040423 T H E C I T Y O F
COPPEE£
April 23, 2004
Mr. Konstandne Bakintas, P.E.
BHB Engineering & Surveying
309 West 7th ST, Suite 500
Fort Worth, TX 76102
RE: Coppell/121 Office Park
Fee Assessment Letter
Dear Mr. Bakintas:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell in the amount of $9,920.74 and forwvard
to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of
the assessed fees that need to be paid prior to filing of thc final plat. Please note that the Texas
Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the
issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office
so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be
paid prior to the scheduled pre-construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered
when those fees are paid.
Appropriate payment of the required fees will help insure a successfid beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely, . ....
~Kcith R. Marvin, P.E.
Civil Engineer
CC:
Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
255 pASKWAY Ir P 0 E~OX 9,478 ~r CO~P~LL TX 75019 ¢r TEL 972/462 0022 *i, FAX 972/304 3673
DEVELOPMENT FEE TABLE
Project: Coppell/121 Office Park
Date: 4/25/2004
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
' Water Impact Fee $2,100.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $61.80
(l 00% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $2,046.30
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $700.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $9,920.74 $9,920.74
(100% due prior to Council Approval)
Street Light Fee lnlbrmation not Available
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
TOTAL $15,168.84
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $9,920.74
DEVELOPMENT FEE WORKSHEET
PROJECT: Coppell/121 Office Park
DATE: 4/23/2004
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 1 inch 2.5 ESU's
1 - 1 inch = 2.5 ESU's
0 = 0 ESU's
1 - 8 inch = 2.5 ESU's
Total #: 7.5 ESU's @ $28000 ea
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 3 Connections @ $5000 ea
(Single family due prior to issuance of budding permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $61 80
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water ,Meter Fee:
Total #: 1 Irrigation Meter(s) @ $61 80
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 1 Fireline Meter(s) @ $1,984.50
(100% due prior to ~ssuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $3000 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $3000 ea
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 25
(Due prior to issuance of building permit)
$28000 ea.
Waste~vater Tap Inspection Fee:
Total fl: 1 . Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total fl: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$2,100.00
$150.00
$61.80
$61,80
$0.00
$1,984,50
$3O.OO
$6O.OO
$700.00
$50.00
$5000
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminar3' plat approved:
After October 26, 1993
0
0
Single-family @ $000 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
SQ00
$0.00
$9,920.74
Information not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: CoppellYl21 Office Park
DATE: 4/23/2004
ROADWAY IMPACT FEE:
Service Area * 1
Category ** Office
Land Use ** General Office Bldg.
Building Area (sf) 8,288
Development Units ** 8.29
Vehicle Miles per Development Unit ** 3.99
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Veh c e M les per Development Unit) x (Fee per Vehicle Mile) ~ $9,920.74
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 ~ Roadway Impact Fee Study)
I AMOUN~DUE: $9 920i74 [