Loading...
Freeport NIP(2.8)-LR040426UTILITY/h ENVIRONMENTAL SERVICES, INC. P.O. BOX 542015 1965 CALIFORNIA CROSSING DALLAS, TEXAS 75354 (972) 556-2913 DATE: 04/26/04 CONTRACTORS NAME: Powell General Contractors JOB NAME: Freeport North Addition CITY: Coppell, Tx ~e × ~ ~ INSPECTOR: Lat,y Davis INSPECTION FIRM: UT~UTY & ENVIRONMENTAL SERVICES OPERATORS: Sergio Aldana PCI CONSTRUCTION PROJINFO PROJECT NUM: [ RESPONSIBLE: I DATE: PCI CONSTRUCTION 04~21/2004 CLIENT RESPONSIBLE: DEPARTMENT: PO BOX: STREET: CITY, ST ZIP: TELEPHONE: FAX: MOBILE: E-MAIL: PCI CONSTRUCTION ISAC UTILITIES P.O. BOX 2967 McKINNEY,TX. 75070 972-562-2762 972-562-2954 PROJ MGR RESPONSIBLE: DEPARTMENT: PO BOX: STREET: CITY, ST ZIP: TELEPHONE: FAX: MOBILE: E-MAIL: CITY OF COPPELL LARRY DAVIS INSPECTOR COPPELL,TX. CONTRACTOR RESPONSIBLE: DEPARTMENT: PO BOX: STREET: CITY, ST ZIP: TELEPHONE: FAX: MOBILE: E-MAIL: UTILITY & ENVIRONMENTAL SERVICES INC. SERGIO ALDANA TV Inspection 1965 CALIFORNIA CROSSING DALLAS,TEXAS 75220 (972)556-2913 972-880-8896 UESERVICES.COM FREEPORT NORTH ADOITION.mclb II PAGE: 1 ~CICONSTRUCTION INSPECTION REPORT DATE: WORK ORDER: WEATHER: OPERATOR: SECTION NR: SECTION NAME: 04~21/2004 SUNNY, DRY SERGIO Al. DANA I PRESENT: VEHICLE: CA.N~RA: PRESET: CLEANED: RATE: PAN/TILT 0 STREET: UNE "SS-I" MAP #1: MH: 0+00 CITY: FREEPORT NORTH ADDITION MAP #2: MH: WWAD 0+6~ LOCALE: COPPELI~TX. TAPE #: I T~D LGTH: 69.8 ft INSPECT REASON: NEW CONSTRUCTION PIPE SIZE: 8" PVC 3.18% MATERIAL: PVC JT LGTH: LARRY DAVIS SECTION TYPE: WASTEWATER LINING: AREA: RSRVD: REMARK: 1:176 DIST OBSERVATION START IN MH. STA. 0+00 STOP IN VVWAD STA. 0+65 END OF SURVEY FREEPORT NORTH ADOITION.mdb // PAGE: 2 Utility & Environmental Services, Inc Low Pressure Air Test for Gravity Sanitary Sewer Test Procedure: Each section of sewer shall be tested between successive manholes. Air shall be introduced into the pipeline until a 4.0 Psi gauge pressure has been reached. At that time, the flow of air shall be reduced and the internal air pressure shall be maintained between 3.5 and 4.5 Psi gauge for at least two (2) minutes to allow the air temperature to come to equilibrium with the temperature of the pipe walls. Pressure in the pipe shall be constantly monitored by a gauge and hose arrangement separate from the hose used to introduce air into the line. Pressure in the pipe shall not be allowed to exceed 5 Psi. After the temperature has stabilized and no air leaks at the plugs have been found, the air pressure shall be used to determine the time lapse required for the air pressure to drop to 2.5 Psi gauge. If the time lapse required for the air pressure to decrease from 3.5 to 2.5 Psi exceeds that shown in the following table, the pipe shall be presumed to be within acceptable limits for leakage. If the time lapsed is less than that shown in the table, the contractor shall make corrections to reduce the leakage to acceptable limits. Line Information Test Results Air Test Mandrel Line I Station to Station I Pipe Size I Psi L.F. TestedI Time Passed? Passed? VVVVAD SS-1 0+00 0+65 8" 4.5 69~8 5:40 Yes Yes Owner: Powell General Contractors Project: Freeport North Addition Location: 585 S. Royal Lane Tested by: Sergio Aldana Inspector: Larry Davis Date: 4/21/04 Job #: of Utility & Environmental Services, Inc. City of: Coppell, Tx