Loading...
Mercantile-CS040428T H E · C I T Y · O F CO?FELL April28,2004 Jon Gesek Tumer-Gesek Investments 722 S Denton Tap Rd, Suite 220 Coppell TX 75019 RE: Mercantile Addition Dear Mr. Gesek: Final acceptance for infrastructure improvements was given to Pacific Builders on April 6, 2004. Two-year maintenance bonds went into effect on that date. It appears that Phase One of your planned development is complete from an engineering standpoint. One item that remains to be dealt with is the large mound of dirt on the north side of the existing building. This dirt pile is growing weeds and has become unsightly. It should be dealt with in one oftxvo ways either remove the excess dirt from the site or spread the dirt on the lot in a manner which will not impact drainage on adjacent properties. If you choose to spread the dirt on the unimproved portion of your development, an erosion fence must be installed around that area to prevent it from washing onto Denton Tap or other sites. Please arrange for this task to be completed in the very near future. If you have any questions, please call me at 972/304-3679. Sinc/~Y'~ FRick ~'~)~e~l Construction Inspector Office Phone: 972/304-7090 Fax: 972/304-3570 CC: Ke~meth M. Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Assistant Director of Public Works Keith Marvin, P.E., Civil Engineer Greg Jones, Chief Building Official