Loading...
ST0301-CS040427 (2)Freese ' Nichots, nc. Engineers Environmental Scientists Architects t701 North Market Street, Suite 500 LB 51 Dallas, TX 75202 214 920 2500 214 g20-2565 fax www.freese.com Ms. Suzan Taylor City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 RE: 60% Plan Submittal Dear Suzan, Enclosed are the plans for the 60% submittal for your review. Two (2) full-size and one (1) half- size set of plans are included with the following information: · Horizontal Control · Streetscape Plan · Sidewalk & Gateway Details · Landscape Schedule & Details · Electrical · Bethel and Coppell Road Paving Plan and Profiles · Proposed SignalLayout · Drainage Area Map & Calculations · Culvert Plan & Profiles · Storm Drain Plan & Profiles · Bethel and Coppell Road Waterline Plan & Profiles · Paving, Storm and Water Details · Bethel and Coppell Road Cross Sections · Cost Estimates · Streetscape Material Selections Booklet and memo. After comparing the 30% and 60% submittal cost estimates, it was determined the significant increases were the bridge and storm drainage estimates. The 30% submittal cost estimate was $4,531,258 and the 60% submittal estimate is $5,490,855 with a variance of $959,597. In closing, we anticipate your review to take approximately three (3) weeks. We are scheduled for a May 27, 2004 meeting so any comments regarding this submittal (bridge options and plan submittal) would be greatly appreciated by May 20th $O we can be prepared for the meeting with the City. If you have any questions, please contact me at 214.217.2217. Sincerely, FREESE AND NICHOLS, INC. Tricia Hatley, P.E. Principal