ST9302-CS 961025 (2)Rady & Associates
A division of Kimley-Horn and Associates, Inc.
Engineering
Planning
and
Environmental
Consultants
October 25, 1996
10-30-96 A10:59 IN
·
910 Collier Street
Fort Worth, Texas
76102-3542
Mr. Ken Griffin, P.E.
City of Coppell
P. O. Box 478
Coppell, TX 75019
Sandy Lake Road and 24" Water Line Reimbursable
R&A No. 06940601
August 31, 1996 Invoice
Dear Mr. Griffin:
We want to correct any confusion which may have been caused by the August
31, 1996 invoice. The contract provides for additional public meetings,
easement descriptions, and the setting of property corners by the surveyor.
The amounts for Item 5 and Item 7 listed on the August 31, 1996 invoice
totaling $10,000 refer to meetings prior to March 1995 which the City has
already paid in full. The only item requiring payment on this invoice is Item
1 which reimburses the surveyor for providing easement descriptions. Any
public meetings occurring since the contract modification have been
considered a part of the basic services and we have not billed these as
additional.
The invoice is laid out with the intention to show all of the services provided
in the life of the project so that any current billings can be compared to
previous billing history.
Under Phase 3 Item 1, the contract stipulates that if the number of parcels
required for the easement description exceeds 35, then any additional parcels
needed for the project must be approved by the City. Your approval to pay
for the three (3) additional parcels prepared can be recorded by signing the
bottom of this letter, and returning it with the invoice.
·
TEL 817 335 6511
MET 817 554 4266
FAX 817 335 5070
Rady & Associates
A division of Kimley-Horn and Associates, Inc,
Mr. Ken Griffin, P.E., October 25, 1996, Page 2
Included with this letter are copies of portions of the contract which define the
items which are included for reimbursement, as well as a copy of the August
31, 1996 invoice.
Very truly yours,
RADY & ASSOCIATES
A division of Kimley-Horn and Associates, Inc.
Lee K. Allison, P.E.
LKA/JEO:pb
Attachment
APPROVAL OF THREE ADDITIONAL PARCELS
PHASE 3 ITEM 1
By:
P:\93021 .~0\93021 LTR'd] ILLINFO.WP
Date:
10/11/96 FRI 11:25
FAg[
}Omley-Hom
and Associates, Inc.
KIIILEY HORN
~ RADY
004
CTZ'Y OF COPPELL
JIM ~A,G~Dnx-~ CPPB, PURCHASING AGENT
P.O, BOX 4'/8
COPPELL, TX 750190478
TIN $&Ogg5615
INV'. DAT~
INVOICe#: 099633
PROJECr #: 0~940601
COPPtR,L SANDY LAIG/RD & WR WLR
PLEASE REPLY TO:
910 COLLIER STRICT
FORT WORTIt, TX 76102
PROJ'. MOLL: LKA
FOR PKOFESSIONAL SF_,R. VICES
RENDEI~I::I~ THROUGH 0g/31/~:
RFAMBLr~ABLE SERVICES:
PHASE 1 ITeM $: 3 PUBLIC M~ETINGS ~ $2,000
PHASE 2 ITEM 7:2 PUBLIC MEk"I'~OS ~ $2,000
PHASE 3 ITEM 1: EASEMENT DESCRIFTION
38 PARCELS (~ $680
PHASE ~ ri'EM 6: SETTING CORNI/RS
o ~'AI~,C~LS @ S20
LESS PREVIOUS BILLINGS
$6,000.00
4,000.00
25,g40.00
$3~,84o.oo
lO~O00.O0
AMOUNT DUE THIS INVOICE ICl5~S40.00
Ao
Bo
EX-HI--IT C
COMPENSATION TO ENGIN~.]::-R AND 'rIME FOR COMPLETION
PHASE ONE - CONCEPTUAL PLAN
Basic Services - For all services listed in the Scope of Services for Phase One,
Item i through Item 4, the City shall pay the Engineer a lump sum fee of
$107,050.00. These fees shall be divided as follows: General Fund $88,025.00,
Water Ftmd $19,025.00.
Reimbursable Services - For the services listed in the Scope of Services for Phase
One,, Item 5, the City shall reimburse the Engineer for attendance at four (4)
public meetings at the rate of $2,000.00 per meeting, for a total of $8,000.00.
Should the City request the attendance by the engineer at additional public
meetings, the Engineer shall be compensated on a per meeting basis at the rate
of $2,000.00 each. Said compensation shall be full payment for preparation for
and attendance at said meetings.
Schedule of Services - Upon written authorization to proceed, the Engineer shall
complete ali Phase One services and be prepared for public meetings within four
(4) months. This schedule assumes timely review by city staff and availability
of data necessary to complete Phase One services.
PHASE TWO - PRKIJMINARY DF, SIGN
Basic Services - For all services listed in the Scope of Services for Phase Two,
except Item 7, the City shall pay the Engineer a lump sum fee of $195,640.00.
These fees shall be divided as follows: General Fund $152,840.00, Water Fund
$42,800.00.
Reimbursable Services - For the services listed in the Scope of Services for Phase
Two, Item 7, the City shall reimburse the Engineer for attendance at two (2)
public meetings at the rate of $2,000.00 per meeting, for a total of $4,000.00.
Should the City request the attendance by the engineer at additional public
meetings, the Engineer shall be compensated on a per meeting basis at the rate
of $2,000.00 each. Said compensation shall be full payment for preparation for
and attendance at said meetings.
Schedule of Services - Upon written approval of the Conceptual Plan and
authorization to proceed, the Engineer shall complete all Phase Two services and
submit Preliminary Plans for review within a maximum of six (6) months and
shall be allowed a minimum of five (5) months for the same. This schedule
assumes timely scheduling of public forums and timely performance of City
reviews.
City of Coppell
Exhibit C - Compensation to Engineer
Page 2.
PHASE THRF. F. - FINAL DESIGN
Basic.Services - For all services listed in the Scope of Services for Phase Three,
except Item 1, the City shall pay the Engineer a lump sum fee of $252,913.00.
These fees shall be divided as follows: General Fund $190,113.00, Water Fund
$62,800.00.
Reimbursable Services - For the services listed in the Scope of Services for Phase
Three, Item 1, the City shall reimburse the Engineer for preparing thirty-five
easement and/or fight-of-way parcel descriptions $680.00 per each parcel, for a
total of $23,800.00. Should it be determined by the Engineer and approved by
the City that additional parcel surveys and descriptions are necessary, they shall
be prepared and the Engineer reimbursed a total compensation of $680.00 per
parcel.
Schedule of Services - Upon written approval of the Preliminary Plans and
authorization to proceed, the Engineer shall complete all Phase Three services and
submit Final Plans and Contract Documents for review within a maximum of six
(6) months and shall be allowed a minimum of five (5) months for the same.
This schedule assumes timely performance of City reviews. Following the f'mal
review by the City, the Engineer shall complete all necessary corrections within
3 weeks and prepare the f'mal construction documents for bidding.
PHASE FOUR - BIDDING
Basic Services - For all services listed in the Scope of Services for Phase Four,
the City shall pay the Engineer a lump sum fee of $6,500.00. These fees shall
be divided as follows: General Fund $4,500.00, Water Fund $2,000.00.
Schedule of Services - Due to the nature of the bidding phase of a project, no
time limitation of the Engineer's services shall be identified herein.
PHASE FIVE - CONSTRUCTION ADMINISTRATION
Basic Services - For all services listed in the Scope of Services for Phase Five,
except Item 6, the City shall pay the Engineer a. lump sum fee of $73,897.00.
These fees shall be divided as follows: General Fund $50,522.00, Water Fund
$23,375.00.
City of Coppell
Exhibit C - Compensation to Engineer
Page 3.
Reimbursable Services - For the services listed in the Scope of Services for Phase
Five, Item 6, the City shall reimburse the Engineer for setting thirty-five
easement and/or fight-of-way parcel comers at a cost of $20.00 per each parcel
comer, for a total of $700.00. Should it be determined by the Engineer and
approved by the City that additional parcel comers be set, they shall be set and
the Engineer reimbursed a total compensation of $20.00 per parcel comer.
Schedule of Services - Due. to the nature of the construction phase of a project,
no time limitation of the Engineer's services shall be identified herein.
ADDITIONAL SERVICES.
Additional Meetings .with City Staff - The engineer shall attend a maximum of
eighteen (18) meetings with City Staff as a part of the basic services identified
above. Should the City request additional meetings with the Engineer, the
Engineer shall be compensated on a per meeting basis at the rate of $800.00 each.
Said compensation shall be full payment for preparation for and attendance at said
meetings with the stipulation that a minimum of fifty percent (50%) of said
meetings shall be at the offices of the Engineer.
Sandy Lake Road and Moore Drive Intersection - The Engineer shall, at the
request of the City, prepare an independent set of contract documents for the
construction of the paving, drainage, utility relocation and signalization
improvements at the intersection of Sandy Lake Road and Moore Drive. The
Engineer shall be compensated for such services on a lump sum basis for a total
of $10,000.00.
City of Coppell
Exhibit B - Scope of Services
Page 4.
o
Presentations and Public Forums: The Engineer shall attend and participate
in four (4) public forums to present the conceptual design of the project to the
citizens of the City. The Engineer shall prepare presentation graphics for use
at the public forums as deemed necessary 'by the Engineer to communicate
information to the public and the Engineer shall participate in the presentations
as deemed appropriate by the City staff.
B. PHASE TWO - PI~F. IJMINARY DESIGN
Water System Analysis~. The Engineer shall perform a hydraulic water system
analysis to evaluate the proposed water system improvements proposed under
this contract. This work shall include:
ao
Collect data relative to the City of Coppell and City of Flower Mound
water system including; water system maps, pump and storage
information, existing hydraulic system models, operational criteria,
condition of individual components and water lines, diurnal demand
distributions for each pressure plane and other relative information
deemed necessary.
Update and edit existing hydraulic models furnished by the City to
reflect existing conditions and operational criteria and update the model
for new computer analyses.
Revise. demands on hydraulic model to reflect those conditions expected
during construction of the 24" waterline and relocation of the 30" water
main.
Revise demands on existing pump stations for expected average day
conditions and prorate performance criteria for the same.
eo
Incorporate the diurnal demand distribution into the hydraulic models in
order to perform extended period simulations of the pressure planes.
fo
Finalize model by reviewing internally and with City staff information
regarding pump performance and staging, on/off settings, tank
elevations, pressures, capacities and line conditions of 30" transmission
main.
City of Coppell
Exhibit B - Scope of Services
Page 11.
o
· Provide trench backfdl methodology,
placement comments; and,
· Provide four copies of the report.
compaction, and
Preliminary. Cost Projection: The Engineer shall prepare and present to the
City along with the Preliminary Plans a preliminary cost projection for
construction of the proposed improvements. The Engineer's cost projection
shall be based upon the most recently available cost data for projects of a
similar nature and scope and the professional judgment of the Engineer. The
cost projection shall not be considered a guarantee of the construction cost of
the project or the bids that may be received on the project nor shall the cost
projection contain any allowance for costs associated with the acquisition of
rights-of-way and/or easements for the construction.
Presentations and Public Forums: The Engineer shall attend and participate
in two (2) public forums to discuss the preliminary design of the project with
the City Council, citizens and/or interest groups of the City. The Engineer
shall prepare presentation graphics for use at the public forums as deemed
necessary by the Engineer to communicate information to the public. The
Engineer shall participate in the presentations as deemed appropriate by the
City staff.
City Review: Upon completion of the preliminary plan documents, the
Engineer shall present two complete sets of the design documents to the City
staff for rextiew. Upon completion of the final review by the City, the
Engineer shall review the City's comments and incorporate the appropriate
changes into the final design.
For review purposes the Engineer shall submit two (2) copies of the plans to
the City. These will be reviewed and checked by the City and one (1) copy
returned to the Engineer with the desired changes noted. Each set of plans
shall be stamped "Preliminary" and dated by the Engineer.
Contract Time: The Engineer shall deliver the preliminary plans to the City
for review in a maximum of six (6) months and the City shall allow a
minimum of five (5) months for completion of the same. Said time of delivery
shall commence upon written acceptance of the conceptual design and shall be
exclusive of the time necessary for interim reviews by the City.
City of Coppell
Exhibit B - Scope of Services
Page 12.
C. PHASE THREE - FINAL DESIGN
Survey - Rights-of-Way: The Engineer shall prepare the necessary easement
and/or fight-of-way documents for the proposed alignment to be utilized during
acquisition. These easements shall be prepared for each parcel and shall
include the following:
ao
Survey side bearing lines of properties for purposes of closure on fights-
of-way takes.
bo
Rights-of-way and Easement Determination: The Engineer shall survey,
render field notes, and prepare plans and individual exhibits for
additional fights-of-way and permanent and/or temporary construction
easements needed. Rights-of-way and Easement plans shall include the
following:
(1)
Location of existing property pins found referenced by station
and offset from the street centerline.
(2)
Location of easement limits either by station and offset from
the street centerline or by offset distance from an existing
property line.
(3)
Area of fights-of-way or easement required.
(4)
Parcel number.
(5)
Lot and block of subdivision or tract and survey identification
of the parcel.
(6)
Name and street address of the last known owner according to
the current tax roles of the City.
(7)
Limits of existing easements and/or fights-of-way.
(8)
The above information shall be presented on 8-1/2" x 11"
paper for each parcel to be acquired and shall also be sealed
by a Registered Professional Land Surveyor.