SS9402C-LR 980717Compaction Test Report Patton, Burke & Thompson 10555 Ncwkirk Street Suite 530 Dallas, Texas 75220 CLIENT: CITY OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 DATE 0--7/17~98 JOBNO~ _1.532 ........ REPORT NO -3! SHEET 1 OF 1_~. ..... SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILITY TRENCH BACKFILL OBSERVATION LABORATORY FIELD TEST DEPTH TEST MAX OMC DRY MC COM- NO. LOCATION FEET TYPE DENSITY % DENSITY % ~ACTION SOIL TYPE ~ANIT~_~EWER. L)~E, pri0R TO ..... 2 CURVE NO, 3 189 ~ECOMPACTION, STA. 0+60 4.0 ',IUC 111.5 17.5 87.9 9.9 79 JO1B'T~O~T532-~ ~ET_E. ST~F T~ST~O' 189 2 CURVE NO. 3 189A NUC 111.5 17.5 115.3 9.1 100 .+ .JOB ~101~153-2 .~TA..~+60 CURVE NO. 5 190 3.5 NUC 117.0 12.O 117.4 8.7 100 JOBNO:T532- ~T6.9±8.~ ....... CURVE NO. 5 191 3.0 ~IUC 117.0 12.0 117.3 8.7 100 JOBI'4OiI$32-'- ~TA: 0±BP CURVE NO. 9 192 2.0 NUC 120.0 12.5 120.9 10.9 100-+ JOB NO.1532 ,'TA. q±_60 CURVE NO. 9 193 1.5 ~IUC 120.0 12.5 120.6 11.5 100 JOB NO. 1532 ~TA._0+7~) CURVE NO. 9 194 0.75 NUC 120.0 12.5 123.6 10.9 100-+ JOB NO. 1532 1 BELOW A~pHALT 2 95% OF ASTM D 698 REQUIRED SPECIFICATIONS:-- ]~0_.. %OFMAXIMUM ASTM D~0 MOISTURE WITHIN % OF OPTIMUM IYPE OF COMPACTION EQUIPMENT AND NO OF UNITS: HAMM 2.2] ~.$HEEP_SFOQT y!.I~RATORY DRUM.!~LLER WACKER P~ACKER [1 } ...... MOISTURE ADDED BY_ WATER TR~CK THICKNESS OF LIFT . ~ ...... INCHES WEE OE EAR]H MOVING EQUIPMENT AND NO OF UNITS: ,LOI"IN DE~ _TRACTgR [ !] PHIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON 1HE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENE AND AT LOCATIONS OTHER THAN THOSE TESTED TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. PROGRBSS REPORT AS REQUESTED, PBT MADE A SITE VISIT TO OBSERVE AND TEST THE UTILITY TRENCH RECONSTRUCTION. THE PBT TECH PERFORMED AN IN-PLACE DENSITY TEST (N0. 189] ON THE UNDISTURBED MATERIAL PLACED IN THE ORIGINAL TRENCH PRIOR TO RECOMPACTION. ONCE THE CONTRACTOR HAD ROLLED THE BOll"OM OF THE TRENCH AND OBTA NED A SU TABLE DENSITY THE GEO-TEXTILE FA~!C WAS PLACED. [HE CONTRACTOR THEN BEGAN TO PLACE THE BACKFILL MATERIAL IN 8" LIFTS BE1WEEN ~ ~ ~'~, 0+90. EACH LIFT WAS ROLLED UNTIL A MINIMUM OF 100% COMPACTION WAS OBTAINED. ,,' AK'. .... . "...~14' [~ IN OUR OPINION FILLCOMFACI1ONMEETSSPECIFICATONSAS NDICATEDBYOUROBSERVATiONSANDTESTNOIS) ] sg'~,!~ ' ~'~- ~--~ -- [] iN OUR OPiNiON, FiLL COMP~JCTiON DOES NOT MEET SPECiFiCATiONS AS iNDiCATED By OUR OBSERVATIONS AND TEST NO.(4~:~,-'1 ~9 _ _~ ANDSHOULDBEREWORKED ~R J ~^'~-D~O ~ - r~.~'... 80610 .:~.~ '~:.. ... ~'~ BOB DYGERT ...........