Loading...
SS9402C-LR 980713Compaction Test Report Patton, Burke & Thompson 10555 Ncwkirk Street Suite 530 Dallas, Texas 75220 CLIENT: CJ1~ OF COPPELL 225 PARION'AY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 REPORFNO 2_8 SHEET_ ] OF SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS ¢OPPELL, TEXAS UTILITY TRENCH BACKFILL OBSERVATION THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMEr~ AS WELL AS THE TESTS SHOWN ABOVE. WE HAVE RELIED UPON THE CO NTP. ACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESE NI. AND AT LOCATIONS OTHER THAN THOSE FESTED TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICA~IONS PROGRESS REPORT AS REQUESTED, THE PBT TECHNICIAN MADE A SITE VISIT FOR CONTINUED OBSERVATION AND TESTING OF THE UTILITY TRENCH RECONSTRUCTION. WHILE ON-SffE, THE PBT TECHNICIAN WAS INFORMED THAT THE CONTRACTOR WOULD NOT BE WORKING ON THIS DATE.