SS9402C-LR 980710Compaction Test Report Patton, Burke & Thompson 10555 Newkirk Street Suite 530 Dallas, Texas 75220 CLIENE: CITY OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILITY TRENCH BACKFILL OBSERVATION LABORAI'O RY FIELD PRIOR TO RECOMPACTION z CURVE NO. 175 ~Nil~AR-~'~EW~R-~T~. 26+75 4.0 NUC 116.3 13.6 83.0 13.6 71 JOBNO~1532- RETEST OF TEST NO. 175 z CURVE NO. 9 175A ............... NUC 120.0 12.5 121.7 12.9 100-~ .JOB-NO~1532 5TA. 26+75 CURVE NO. 9 176 ...... 3.5 ~IUC 120.0 12.5 120.3 11.2 100 3OBNO~1532--- STA~._26~75. CURVE NO. 9 177 3.0 ~IUC 120.O 12.5 125.1 11.9 1OO+JOBNO. 1532-' p_RiOR_T~.R_ECO_MP_ACT!~N_ 2 CURVE NO. 30C 178 5TA. 25+30 4.0 NUC 116.3 13.6 97.3 18.1 84 1 BELOWASPHALT 2 95% OF ASTM D-698 REQUIRED SP~C~rICATIONS: ~ 10~ ~o OF ~IMUM ~TM D 698 MOISTURE WiTHiN .... % OF OPTIMUM ~E OF COMPACTION EQUIPMENT ~D NO. OF UNITS: ~T.~4~:C SUE_E~S~OOT~IB~TO~ DRUM R~[~ W~KE_~ PACK~R~ ) JQHN DEER.~.T~CTOR THIS REPORT PRESENTS OPfNIONS FORMED A~ A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COM PACTIVE EFFORT AND MOISTURE TO ACHieVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENt AND AT LOCATIONS O~PrtE R 1~rlAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. PROGRESS REPORT AS REQUESTED, PDT MADE A srrE VISIT TO OBSERVE AND TEST THE UTI~ ~[-L. RECONSTRUCTION. BACKF LL MATERIAL WAS PLACED N THE TRENCH BEWVEEN 5~,~ EACH LIFT WAS APPROXIMATELY 8" THICK AND WAS ROLLED UNTIL A MINIMUM OF 100% COMPACTION WAS OBTAINED. ADDITIONAL TRENCH WAS OPENED UP BETWEEN sT~*-2~+&0 ~ 25+0~. THIS IS THE AREA THAT WE OBSERVED APPROXIMATELY 8" OF SETTLEM~R.~THE ~HALT pN 6/25/98. THIS SECTION OF TRENCH WA5 EXCAVATED TO A DEPTH OF 4' AND WAS ,~~f 11 ~ (CONTINUED ON SHEET 2 OF REPORT NO. 271 [] IN OUR OPINION. FILl. COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO,ISI AND S.OULO ~E REWOR~D ~'*:'. ..... ~.:'.~ ......... ~:.~.§ SCOPE OF OBSERVATION: EXFULLTIME; [] PERIODIC, ONCALLBASlS; ~CONTRACTOR'SORCUENT'SREPRESENTATIVEAD~Sr~ j I~J~i~'~,~I~.RG J~ BOB DYGERT / Compaction Test Report Patton, Burke & Thompson 10555 Ncwkirk Street Suite 530 Dallas, Texas 75220 CLIENT: ClIY' OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 DATE .... 07/10/98 JOB NO 1532 .......... REPOr~TNO .... 2? ....... SHEET .~ OF ~_ ..... SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILITY TRENCH BACKFILL OBSERVATION SPECIFICATIONS; .1~0 .... %OFJVIAXIMUM . AS.TM D 698 g_A_T CP4~37_~_SHEEPSFOO_T VIBRAT~.DRUM ROLLE~ .W..~C K_ER PACKE.I~g ] THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATtON OF FILL PLACEMENT AS WELL AS THE TESTS SHOWN ABOVE WE HAVE RELIED UPON THE CO NTP, ACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESEN1, AND AT LOCATIONS OPrlER THAN THOSE TESTS D. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS PRO(~RESS REPORT (CONTINUED FROM SHEET 1 OF REPORT NO. 27) PRIOR TO THE PLACEMENT OF THE GEOTEXTILE FABRIC IN EITHER AREA, THE PBT TECH PERFORMED AN IN-PLACE DENSIIY TEST ON THE UNDISTURBED MATERIAL IN THE ORIGINAL TRENCH [TEST NOS. 175, 175A, 178]. [] INOUROPINION, FILLCOMPACTIONMEETSSPECIFICATIONSASINDICATEDBYOUROBSERVATIONSAND ES NO,(SI .... ~J. it ~/~___ [] ~N~UR~P~N~N~F~LL~MFA~T~ND~ESN~TMEET~PE~F~AT~N~AS~ND~CATEDBY~UR~B~ER``~9~T~N~ANDTE~1.N~.j$) ...... ~'~',," ..... ~ ~?~, ~ :~..:... ~ ..* ~. AND SHOULD BE REWORKED -- · .** ............... : ~ ~ / -- : 80-' : ~' Pat l,,. ~h~p.,;on ~:,. '~. t/tO