Loading...
SS9402C-LR 980706Compaction Test Report Patton, Burke & Thompson 10555 Newkirk Street Suite 530 Dallas, Texas 75220 CLIENT: CI1Y OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 DATE O7/06/98_ JOB NO 1_53~ ......... REPORTNO ~_~ SHEET 1_ OF _ _2 ..... SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILITY TRENCH BACKFILL OBSERVATION LABORAR~RY FIELD TEST DEPTH TEST MAX OMC DR'/ MC COM- iTA. 30~2~ ...... CURVE NO. 9 144 3.0 NUC 120.0 12.5 119.5 14.3 100 JOB NO. 1532 ;T~,_31 +~00 ...... CURVE NO. 9 145 3.0 NUC 120.0 12.5 120.0 13.8 100 JOB NO. 1532 .;T~. 32+10. ...... C_ L~RVE N_o: 9__ 146 3.0 NUC 120.0 12.5 121.6 12.4 100+ JOB NO.1532 iTA,_Z9_+ ! o_ gURV-E_ ~0: ? 147 2,5 NUC 120.0 12.5 121.8 11.8 100+JOBNO. 1532 )TA. 27+30 ........ CU_R .~ NO. 148 1,,~ NUC 120.0 12.5 120.3 13.8 100 JOBNO. 1532 ~T/c 2~ ±30 .............. CP~ NO~...~ 149 ~,0 1UC 120.0 12.5 119.5 12.3 100 JOBNO. 1532 ~L 30±50 ~URVE.~9_:.?_ 150 2.5 NUC 120.0 12.5 119.5 12.9 100 JOBNO. 1532 1,51 2.5 NUC 120.0 12.5 119.5 13.9 100 JOBNO. 1532 1 BELOW ASPHALT SPECIFICATIONS: 100 %OFMAXIMUM .ASTM D 6.9!~ ~ ] ]02SHEERSFOOT VIBRATORY DRUM RQLLER CAT ~433-S SHE~.SFOOT VIBRATORY DRUM ROLLER JOHN DEERE~RACTOR THIS REPORT PRESENTS OPINIONS FORMEO AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTiVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVi:R IS NOT PRESENT AND AT LOCATIONS OTHER THAN THOSE TESTED TEST DATA ARE NOT THE SOLE BAS~S FOR OPINIONS ON WHETHER TH E FILL MEETS SPECIFICATIONS PROGRESS REPORT AS REQUESTED, PBT MADE A SITE VISIT TO OBSERVE AND TEST THE UTILIIY TRENCH ~E,C~I~RUCTION. THE COeNTRACTOR PLACED BA, CKFILL MATERIAL BE1WEEN STA. 25+50 ~ '~-e~ AND 29+2J, 29+70 ~ $2+30'. EACH LIFT WAS APPROXIMATELY 6" THICK AND WAS ROLLED UNTIL A MINIMUM O_F~1~% ggMPACTION~JVAS OBTAINED. DUE TO THE WET MATERIAL IN THE BOTTOM OF THE TRENCH BETWEEN ~JJ"A. ~ 35+30, A CEMENTIOUS MATERIAL WAS MIXED IN USING A BARTMILL MIXER. THIS MATERIAL WAS LEFT IN PLACE OVERNIGHT. ~ IN OUR OPINION, FILL COMP~TION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S)_ ..I '4'~. ]4~,. ~1~.~. ~.'~ ~: ~..~ ~;~ ~l! 50,151 [] IN OUR OPINION, FILL COMP/~'~TION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO (Si CONTRACTOR'S OR CLIENTS REPRESEN?ATIVE ADVtSED~ J~. SCOPEOFOBSERVATION: L~FULLTiME; [~ PERIODIC, ONCALLSA$1S; ~ IR~I~:]~ERBERG ~',, / BOB DYGERI ~ ~' BF Compaction Test Report Patton, Burke & Thompson 10555 Newkirk Street Suite 530 Dallas, Texas 75220 CUENT: ClIYOF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 DATE: 07/06/9.8 JOB, NO REPORT NO ~ SHEET 2 OF 2 SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILI1Y TRENCH BACKFILL OBSERVATION LABORATORY FIELD ~TA. 27+30 ..... CURVE NO. 9 152 .75 4UC 120.0 12.5 120.6 13.0 100 JOB NO. 1532 153 2.5 NUC 120.0 12.5 119.5 12.4 100 JOBNO. 1532 1,54 1.0 NUC 120.0 12.5 119.5 14.1 100 JOB NO.1532 1 BELOW A.~PHALT SPECIEICATIONS:. 100 .... % OF MAXIMUM ASTM D b98 MOISTURE WIIHIN .... % OF OPTIMUM 1YPE OE COMPACTION EQUIPMENT AND NO OF UNITS CASE 1.102 SI~EEP~OOT VIBRATORY DRUM ROLLER CAT CP433-S SHEEPSFOOT VIBRATORY DRUMROLLER MOISTURE ADDED BY THICKNESSOF LIFT ~ .... INCHES 1YPE OF EARTH MOVING EQUIPMENT AND NO OF UNITS JO~tNDEERE TRACTOR THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVA]ION OF FILL Pt~CEMENE AS WELL AS THE TESTS SHGWN ABOVE WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING T~MES WHEN OUR OBSERVER IS NOT PRESENT AND AT LOCATIONS OTHER 1NAN THOSE TESTED TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILE MEETS SPECIFICATIONS. PROGRESS REPORT (SEE SHEET 1 OF REPORT NO. 23).