ST9302-CS 960517 (3)SENT BY:CITY OF DALLAS ; 5-17-96 ; 12:07 ; WATER UTILITIES~ 214 804 3570;# 2/ 8 ClCtlIOS tUQTer uTilitieS PIPELINE DESIGN ENGINEERING 320 East Jefferson Room 211 Dellae, Texas 75203 (214) 948-4620 FAX (214) 946-4599 May 17, 1996 Ken Griffin, P.E., City Engineer City of Coppell Sandy Lake Road from Denton Tap to'MacArthur Blvd. Review Comments for 30" RC water Design My staff has reviewed the construction plans for the relocation of the DWU 30" RC water transmission main in sandy Lake Road which serves the city of Flower Mound. The most critical item of concern is the shutdown time required for implementing the water main adjustments to clear the paving and drainage improvements. Per the attached memo from Phil Boyd, Manager of Wholesale Services Division, a "winter-time, low-demand, shutdown not lasting much longer than 48 hours" is the bottom- line requirement that must be met. Please submit a plan of action whereby this requirement can be met while utilizing the current design alignment in the same trench as the existing main. Or, alternatively, please redesign with an offset alignment that will allow the existing main to stay in service during construction of the proposed main; tie-ins at each end of such an offset are estimated to take 48 hours each. In either case, please take into account the locations of the proposed 24" diameter drill-shaft base supports for the street lights which are in the same vicinity along the median as is the water main. Additional comments are as follows: 1.) Call for temporary strap-welded dished-head test plugs at each end of each lowering for pressure testing prior to tie-in. ~.) Provide a re~erence to Appurtenance 414W-9 and 414W-10 for type 2 air valve installations. 3.) Call for butt-strap closures at each tie-in. 4.) Call for "bar-wrapped" concrete cylinder pipe, which has replaced "pre-tensioned" pipe. 5.) Provide a reference to Appurt. 414W-11 in the installation note for a horizontal gate valve. 6.) Call out all horizontal and vertical deflection angles in degrees and minutes. A city utility providing Dallas with water puritiCal'Or', e. Hd diStrilUutiO,%, waste water collection and treatn%ent SENT BY:CITY OF DALLAS ; 5-17-96 ; 12'08 ; WATER UTILITIES~ 214 004 8570;# 3/ 3 7.) Add a General Note to the plans: "Contractor to contact DWU Water Operat].on~ Supervisor, John Wilson, at 670-8063, or his assistant at 670-8064, at least 10 working days in advance of scheduled tie-ins to request 30" water main shutdown and emergency water main connection activation, shutdowns are limited to 48 hours in duration and are limited to the months of October through February." 8.) All DWU pipeline construction must be shown on plans with a DWU File number in the title block, utilize File 685W-678A for this project. Provide sheet numbers inside a 3/4" diameter circle adjacent to the title block; start with sheet l. Mylar reproducible originals must be supplied to DwU at the completion of construction showing all "as-built" information pertinent to the DWU water main. Should you have any questions, feel free to call A1 Battad at 948-4591. Project Manager Re locat i OhS / DART Attachment c: ~.'~"Milstead P. Boyd J. Wilson A. Battad File 96138MF1.KGriffin