Loading...
SS9402C-LR 980625Compaction Test Report Patton, Burke & Thompson 10555 Newkirk Street Suite 530 Dallas, Texas 75220 CIIY OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL. TEXAS 75019 DATE 06/25/98 ;OB NO 1532 REPORT NO 16 SHEET .IOF 2_ SUBJECT BETHEL ROAD SEWER liNE BACla:ILL REPAIRS COPPELL, TEXAS UT1LIIY TRENCH BACKFILL OBSERVAllON LABORATORY FIELD TEST DEPTH TEST MAX OMC DRY MC COM- NO. LOCATION FEET IYPE DENSITY % DENSITY % ~CTION SOIL TYPE PCF PCF % STA. 12+Z5 C UL~'yE N~.. ~_ !!8 I ~ NUC 119_~ 12.C 119.cj 11.~ 100 JOBNO. 1532 5TA. 12+25 (~.~_~. NQ. 6 1to I ~ Nu~: 119.E 12.£ 122.~ 9.3 100. ~- JOB NO. 1532 -STA. 12+~7o ...... ~URVE NO, 6_ 'l-~n 1 (' NUC 11q~ 12.£ 122.] 10.! 100. ~- JOB NO. 1532 STA. '~3+..10 CURVE.HO. 6_ RETESTOF TEST NO. 10] CU ~RVE- N~,-33E Tn'l NU~: 104.1 20.2 103..~ 12.~ 99 JOB NO.1532 SPECIFICATIONS:. 100 % OF MAXIMUM ASTM D 698 HAMM 22]0 VIBRATO~ ~HEEPSFOOT DRUM ROLLER . WACKER PACKER [!] MOISTURE ADOED BY WATER TRUCK ~ 1845C-UNI-LOADER (1} 'PHIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FrLL PLACEMEN~ AS WELL AS THE TESTS SHOWN ABOVE WE HAVE RELIED UPON THE CONTRACTOR TO APPLY TH E NECESSARY COMPACTFVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER iS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED, TE SE DATA ARE NOT THE SOLE BA~IS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS PROGRESS REFORT A~ REQUESTED, PBT MADE A SffE VISIT TO OBSERVE AND TEST 11'IE UTILIIY TRENCH RECONSTRUCTION. BACI(7:ILL MATERIAL .W..AS. PLACED IN THE UT1LIIY TRENCH BEIWEEN B"TA, 1'2+00 AND ~T~ )t~F~m~EACH LIFT WAS APPROXIMATELY 6 THICK AND WAS ROLLED UNTIL A MINIMUM OF 100% DENSIIYWAS ~gD. THE COUNTY REMOVED THE REMAINDER~C)F THE CTB AND ASPHALT BETHEL ROAD BE'1WEEN STA. 25+55 AND $'rA. ~5+20. THE CONTRACTOR BROKE [CONTINUED ON SHEET 2 OF REPORT 16] ~] ~',~ OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR O~SERVATIONS AND TEST NO.IS) L~ N OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVADONS AND TEST NO-(S)~ l~ ~L~'.~"'~ BF Compaction Test Report Patton, Burke & Thompson 10555 Newkirk Street Suite 530 Dallas, Texas 75220 CLIENT: CITY OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 DATE: 06/25/98 JOB. NO 1532 -- REPORT NO ~ 16 SHEET ~)F 2 SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILITY 11~ENCH BACKFILL OBSERVATION LABORATORY FIELD TEST DEPTH TEST MAX OMC DRY MC COM- NO. LOCATION FEET TYPE DENSITY % DENSITY % ~,CTION SOIL TYPE PCB PCF · % SPECIFICATIONS: 100 % OF MAXIMUM A~TM D 698 MOISTURE WITHIN % OF OPTIMUM TYPE OF COMPACTION EQUIPMENTAND NO OF UNITS: _.HAMM_2210 VIBRATORY SHEEPSFOOT DRUM ROLLER _ WACKER PACfl(ER (1 MOISTURE ADDED BY WATER TRUCK THICKNESS OF LIFT 6-8 iNCHES lr~pE OF EARTH MOVING EQUIPMENT AND NO OF UNITS CASE 1845C UNI~LOADER [] THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLAC EMEN~ AS WELL AS THE TESTS SHOWN ABOVP WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTJVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION OURING TIMES WHEN OUR OBSERVER IS NOT PRESENE AND AT LOCATIONS OTHER THAN THOSE TESTED, TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL ME ETS SPECIFICATIONS PROGRESS REPORT (CONI'INUED FROM SHEET 1 OF REPORT NO. 16]. AS WATER FLOWED INTO THE EXCAVATED TRENCH. WE OBSERVED RAPID SETTLEMENT OF THE ORIGINAL BACKFILL MATERIAL UNDER THE ASPHALT AT ST~.. ~ THIS MATERIAL SETTLED APPROXIMATELY 8" IN THE FIRST 10 MINUTES.