SS9402C-LR 980623Compaction Test Report Patton, Burke & Thompson 10555 Newkirk Street Suite 530 Dallas, Texas 75220 CI1Y OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL. TEXAS 75019 DATE: 06123/98 JOBNO t532 REPORT NO 14 _ SHEET ~ 1OF _ 1 - SUB.~ECT BETHEL ROAD SEWER LINE BAClO:ILL REP.aJRS COPPELL, TEXAS UTILIIY TRENCH BACKFILL OBSERVATION LABORATORY FIELD TEST DEPTH TEST MAX OMC DRY MC COM- NO. LOCATION FEET TYPE DENSITY % DENSITY % ~AC TION SOIL T'~PE PCF PCF % STA; 9+60 CURVE NO. 3 ' "" _CURVE STA. t0+25 STA. 10+60 CURVE NO. Z '"" CUE~E NO 5TA, 9+00 CURVE NO. 1 8~LOW ASlq~LT SPECIFICATIONS; t OO % OF MAXIMUM . ASTM D 698 MOISRflRE WITHIN % OF OPTIMUM 1YPE OF COMPACTION EQUIPMENT AND NO OF UNITS: ~M~tO ~TO~ ~EPS~T DR~ ROLLER W~ ~C~R [t] MOIS~RE ADDED BY WATER ~K THICKNESS OF U~ 6-~ INCHES ~PE OE ~TH MOVING EQUIPMENT AND NO OF UNITS C~ UNFL~ (t] THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLAGEMENE AS WELL AS TH E TESTS SHOWN ABOVE WE HAVE RELIED U PON TH E CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO AC HI~VE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT AND AT LOCATIONS OTHER THAN THOSE TESTED TE ST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FrLL M EET3 PROGRESS REPORT AS REQUESTED. PBT MADE A SITE VISIT TO OBSERVE AND TEST THE~,T~E~H , __ RECONSTRUCTION. BACKFILL MATERLaJ- WAS PLACED IN THE TRENCH BL:IN~EEN ~q~+~!~.~ !] aeC; EACH LIFT WAS APPROXIMATELY 6' THICK AND WAS ROLLED UNTIL 100% DENSIIY WAS OBTAINED. THE MATERIAL FROM THE cONTRACTOR'S PiT CHANGED AND WE OBTAINED ANOTHER PROCTOR SAMPLE. NO ADDmONAL TRENCH WA5 OPENED ON THIS DATE. [] OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ~ ?N OUR OPINION FILL COMPACT'ON DOES NOT MEET SPECIEICATIONSAS INDICATED BYOU" OI~SERVATLDNSAND TSST NO.I', AND SHOULD BE REWORKED SCOPEOFOBSERVAT'O": [~ r~LLTIME; r~ PERIODIC, ON CALL BASIS; ~ ~ONTRACTORSORCLIENTSREPRESENTATI~'EADVI$ ~,I~,~.~.o.,r~WIG~*