Loading...
SS9402C-LR 980617Compaction Test Report Patton, Burke & Thompson 10555 Newkirk Street Suite 530 Dallas, Texas 75220 CUENT: CIIY OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 DATE. 06/17/98 JOB NO 1532 REPORT NO 9 SHEET t OF ~1 SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILrrf TRENCH BACKFILL OBSERVATION LABORATORY FIELD TEST DEPTH TEST MAX OMC DRY MC COM- NO. LOCATION FEET TYPE DENSITY % DENSITY % ~ACTION SOIL TYPE FCF PCF % SANtTARY SEWER LINE; STA: 4 +3&-- CURVE NO. 5 · ..7.v ~ "~.0 ~. ~-~.~ '~ 0.'~ '~0- 40 I $ .NUC T T SANft'ARY SEWER kINE; STA 3+90 CURVE NO. 41 1.5 ."'."JC !!7.0 '~nr~ ............. 1'~4 '~'~ r~ Tnn Safl'41TARY SEWER LINE; STA. 5+60 CURVE NC). 5 42. 4.0 NUC 1~.?.~ ~.2.0 !'~_a.5 0~ !nn. ~R~ ~SANITARY SEWERUNE, STA. 6+tO .CURVE NO. 6 45 3.~ SANtTARY SEWER LINE, STA: 4+50 CURVE 44 .75 &IHP 11o 191q 191 ~. 11 ,~ ln~-._IQRNt~1532 SANIT.AR~ SEWER LtNE~ 6TA, 3.4- 75 C;U~ -~ k.~ ~o 19~1 191 R 11 ~ lnn-.J~aNt~1~32 45 ............ ,~tITARYSE'WER UNE, STA, 3+50 . CURVE N~, 6 SANITARY SEWER LINE~ STA. 8+00 ~ CURVE NO, 1 BELOW TOP OF ASPHALT 295% OF ASTM D-698 REQUIRED SPEC~HCATIONS: 100 % OF M~3(IMUM ~ ASTM D 698 MOISTURE WITHIN _ % OF OPTIMUM 1~PE OF COMPACTION EQUIPMENTAND NO. OF UNITS: HAMM 22T0 VIBRATORY DRUM ROLLER (1)~ WACKER PACKER[IT; DYNO RAG VIBRATORY DRUM ROLLER (1] MOISTURE ADDED BY ~ICKNESS OF LIFT 6~ INCHES "r~PE OF EARTH MOVING EQUIPMENT AND NO OF UNITS DAE~DTRACKH~ ( t},- UNt*L(~DER ( I ] I~lS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL pLACEMEN[ AS WELL AS THE TESTS SHOWN ABOVE WE HAVE RELIED UPON TH E CONTRACTOR TO APPLY ~IE NECESSARY COM PACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT AND AT LOCATIONS OTH ER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS PROGRESS REPORT AS REQUESTED, PBT MADE A SITE VISIT TO OBSERVE AND TEST THE UTILITY TRENCH RECONSTRUCTION. A SANDY C_LAY WITH GRAVEL BA,CKFILL MATERIAL WAS PLACED IN THE UTILITY TRENCH Re"'I~EI~i 5q"A. 5+35 AND 6+11~+ I$ AND 8+00. ~l-IIS MATERIAL WAS PLACED IN 6' LIFTS AND COMPACTED ~T~.-~'1~00% DENSITY WAS OB~INED. PRIOR TO THE PLACEMENT OF THE FILL MATERIAL, THE BO1TOM OF THE TRENCH WAS COMPACTED UNTIL SUFFICIENT DENSIIY WAS OBTAINED. AFTER SUFFICIENT DENSrlY WAS OBTAINED THE GEOTEXTILE FABRIC WAS PLACED IN THE BOTrOM OF THE TRENCH. (CONTINUED ON SHEET 2 OF REPORT NO. 9] [] ,~gl OUR OPINION. FILL COMPACTION MEETS SPECIFIC-A~,F~I,~,~,~**~ ~I[~iUR O"ERVATIONS AND TEST NO.[S)40'~ [] I~N OUR OPINIO~ EILL COM FACTION DOES NOT ME,~ .f~ICATI~/~S A~'~' .~.~ ID BY OUR OBSERVATIONS AND TEST NO,(S) A D,"OUEDBS. O""D SCOPEOPO~SERV^.OU: LJ ~4UU..ME; r~ PERlOt~c.t,a.t~.~-]a;.D.,~t::,O.~?j.' TOR'SO"CUEm'S~E"RESEUTAT~VEADWSED DAN (PAVCO) / "7 .......... ''' "" Compaction Test Report Patton, Burke & Thompson 10555 Newkirk Street Suite 530 Dallas, Texas 75220 ClIY OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 DATE 06tt 7/98 JOE~ NO t552 REPORT NO 9 SHEET 20F SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL TEXAS UTILITY TRENCH BACKFILL OBSERVATION LABORATORY FIELD TEST DEPTH TEST MAX OMC DRY MC COM- 2 SANffARY SEWER LtNE~ ST~ 8+60 CURVE NO~30 SANffARY SEWERLINErb'TA~ 6+30 CURVE NO~ 6 49 2.5 HUC ?'~9._ '~_n '~'~a A 1,4 ~ oA Inn Fdt-) 1RR9 SANITARY SEWER LINE,- STA, 5+75 CURVE~IO. 5 RETEST OF TEST N0~49 _ CURVE_NO..5 RETEST-OF TEST NO~ 48 ! CURVENO. 30 ~ s~s"'T~~,.,. n~,,v,.n~'~'~"~'~n*~'tl~"~'l ......... klll~"~ 1 lA ""/ 11 a I 1'4 ~ F~ R ~7 IfJR NC) 1~A2 SANFrARY SEWER LINE~ STA. 6+,50- CURYE NO.~5 ~. '~f~ IdllP ]17fl l'*)n 111 ~1 179 RETEST OF TEST NO. 51 CURV~ N~5 5~,~ IMI It*' 117n 19n 117') 1fi4 1fl(] JOB N0.1532 1 BELOW TC~ OF ASPHALT 295% OF AS]M D'-69B REQUIRED SPECIFICATIONS: t00 % OF MAXrMUM ASTM D698 MOISTURE WITHIN % OE OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO OF UNITS: HAMM 2210 VIBRATORY DRUM ROLLER (1 ]~ WACKER PACKER (t]~ DYNAPAC VIBRATORY DRUM ROLLER [1 ) MOISTURE ADDED BY THICKNESS OF LIFT ~-8 INCHES IYPE OF EARTH MOVING EQUIPMENT AND NO OF UNITS: DAEWOODTRACI(HOE (1]i UNI.J~OADER THiS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF EILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACT[VE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT AND AT LOCATIONS OTHER THAN THOSE TESTED TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECiFiCATIONS PROGRESS REPORT (CONTINUED FROM SHEET 1 OF REPORT NO. 9]. AN IN-PLACE MOISTURE DENSIIY TEST WAS PERFORMED PRIOR TO RECOMPACTION AND ANOTHER TEST WAS PERFORMED IN THE SAME I, OCATIONAFTER RECOMPACTION [TEST NOS. 48 AND 4BAl. ADDITIONAL TRENCH WAS OPENED P BETWEEN ~ 8~F75 ~ 11 +00~ DURING THE EXCAVATION OF MATERIAL FROM THE TRENCH, THE CONTRACTOR ENCOUNTERED TRASH MATERIAL CONSISTING OF AN OLD SANITARY SEWER MANHOLE RING AND PIECES OF OLD CLAY PIPE, AND 4 LARGE PIECES OF CORRUGATED SHEET METAL. E]~I OUROPINIOI~ FILLCOMPACTION MEETS SPECIFICATIO~,~q~,~.~.%..D.~I:~.~OBSERVATIONSANDTEST NO.{S) 48Aj 49A, ~0~51A ,. our O.NIO~. F,LL COM P~CnON DOES NOT MEET sa~;~1 ~.~,es '~I~..~L~ S¥ OUR O~E~r,ONS AN D .~; .O IS, -- 48 49 51 AND SHOULD BE R~RKED SCO. OFO~E~AnON: ~LLnME; ~ PERIOD'~F~.~~SORCUmrSeEPRESENT*nVEAD~SED D~ [PAVCO) C