Loading...
SS9402C-LR 980616Compaction Test Report Patton, Burke & Thompson 10555 Newkirk Street Suite 530 Dallas, Texas 75220 CLIENT: CITY OFCOPPELL 225PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 DATE 06/16/98 JOBNO 1532 REPORT NO 8 SHEET I OF 2 SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILITY TRENCH BACKFILL OBSERVATION SANITARY SEWER UNE, STA. 3+40 CURVE NO. 4 · ~,~ 35 Nuc 119,0 13,0 122.5 12.3 100~.JOBNO. 1532 SANITARY SEWER UNE, STA. 5+75 CURVE NO. 30 ,)-~ DDIr~D ~'r~ t-t~npat'~c~ ,l 0 NUC 116.7 11,4 99.3 12.7 85 JOB NO. 1532 CURVE NO. 30 RETEST OF TEST NO. 2Z · ~'~A~,¢T~:D OI-',""t"'~.4Da~"Th'"""~l~ NIIC 116.7 11,4 113.9 14.7 98 JOB NO. 1532 8ANITARYSEWER LINE,.STA. 4+50 CURVE NO. 5 · -,0 .'to NLIC: 117,1[ 19,Q 118.4 11.7 100 JOBNO. 1532 SANffARY SEWER LINE, STA. 4+00 CURVE NO. 4 · ~,~ 30 NUC 119,(; 13.0 121.6 12.2 100' JOBNO. 1532 SANITARY SEWER UNE._STA. 4+60. CURVE NO. 5 '~n 35 NUC 117.£ 12.0 118.2 13.0 100' JOBNO. 1532 SANITARY SEWER LINE, STA..4+50 CURVE NO. 5 -~ 2.5 NUC 117.C 12.0 117.4 11.1 100 JOBNO. 1532 SANITARY SEWER LINE. STA._4+00 CURVE NO. 5 ~,-, 30 NUC: 117.C 12.0 116.~ 11.4 100 JOB N0.1532 1 BELOW TOP OF ASPHALT 295% OF ASTM D-698 REQUIRED SPECIFICATIONS: 100 % OF MAXIMUM ASTM D 698 MOISTURE WITHIN % OF OPTIMUM ~YPE OF COMPACTION EQUIPMENTANE) NO OF UNITS HAMM 2210 VIBI~TOI~ DRUM ROL~R [11 MOISTURE ADDED BY THICKNESS OE LIFT 6'~8 INCHES I~PE OF EAR I~1 MOVING EQUIPMENT AND NO OF UNITS: 1845C UNI-LOADER (l}, DAEWOOD 220LG T~CKHQE [1) THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PI~,C E M E NE AS WE LL A~S THE TESTS SHOWN ABOVE WE HAVE RELIED UPON TH E CONTRACTOR TO APPLY THE NECESSARY COMPACEIVE EFEORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING T~MES WHEN OUR OBSERVER IS NOT PRESENL AND AT LOCATIONS OTHER THAN THOSE TESTED TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS PROGRESS REPORT AS REQUESTED, PBT MADE A SITE VISIT TO OBSERVE AND TEST THE UTILIIY TRENCH RECONSTRUCTION, A RED BROWN CLAYEY ,SAND WiTH GRAVEL MATERIAL WAS PLACED IN THE UTIIIY TRENCH BETWEEN ~I'A. 3+30 AND STA. 4+ 65 IN 6" L ETS: EACH LIFTWAS COMPACTED UI~IL A MINIMUM OF 100% DENSITYWASoBTAINED A SECTION OF TRENCH. .... i_'~."' _~rl_ _ J~ CEMENT TREATED BASE APPROXIMATELY 4' THICKAND WAS LEFT IN PLACE. A SECTION OF TRENCH WAS EXCAVATED BETWEEN STA. 5+35 AND STA. 6+85 [CONTINUED ON SHEET 2 OF REPORT NO. 8] ...... F~ J~ OUR onn~ON, AND SHOULD BE REWORKED SCOPE OF OBSERVATION: E~ ~(ILL TIME; rLj PERIODIC, ROBSBRVATONSANDTESTNO(Sl 26 27A, 28-32 27 ¥ OUR OBSERVAT ONS AND TEST NO IS] ~ OR CLIENT'S REPRESENTATIVE ADVISED DWIGHT [PAVCO] Compaction Test Report Patton, Burke & Thompson 10555 Ncwkirk Street Suite 530 Dallas, Texas 75220 CLIENT CITY OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 DATE 06116/98 JOB NO 1532 REPORT NO 8 SHEET 20E _. 2 SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILilY TRENCH BACKFILL OBSERVATION 5ANEAE¥ 8EWER-LtNE~ STA. 3+50- -an MIIP 117~ 10~ 11AA 11.4 1~0 .10BN0.1532 ~4 an Milt 117~ 19n 1192 11.8 lOOd JOBNO. 1532 ~ff~ ~RL~, ~A, 3+70 .- 35 oA mile 117n 12~ 117~ 11.1 100 JOBNO. 1532 ~ff~-~ER Ll~, ~A, 4+30 ~ en ~11~ 117~ 12D 118.1 11.7 1~0' JOBNO. 1532 ~ff~ S~ER L~E, 5TA. 3+95 CU~ NO. 5 ~7 ~n ~H~ 117r 120 117.3 12.1 100 JOBNO. 1532 ~ ~ERLI~, ~A, 3+60 C~ NO~ 3~ ~n ~H~ ~7C 19n 119.2 12.4 100. JOBNO. 1532 ~A~ ~ER ~, ~A. 4+40 _C~E NO. 5 3~ 9n NII~ 117~ 19~ 118D 12.8 100 JOBNO. 1532 1 BELOW TOP OF ASP~IALT ~o OE MAX MUM ASTM I)698 SPECIFICATIONS: 100 ° i MOISTURE WITHIN % OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO OF UNITS HAMM 22t0 VIBRATORY DRUM ROLLER [1 ] MOISTURE ADDED BY THICKNESS OF LIFT 6-8 INCHES TYPE OF EARTH MOVING EQUIPMENT AND NO OF UNITS 1845C UNI-LOADER [1], DAEWOOD 220LC TRACKHOE [1] THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMEN~ AS WELL AS THE TESTS SHOWN ABOVE WE HAVE RELIED UPON THE CONTRACTOR TO APPLY TH E NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING qMES WHEN OUR OBSERVER IS NOT PRESENT AND AT LOCATIONS OTHER THAN THOSE TESTED TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER TH E FILL MEETS SPECIFICATIONS PROGRESS REPORT {CONTINUED FROM SHEET 1 OF REPORT NO. 8).... AND ANOTHER SECTION BETWEEN ErA. ~ 8.t.~L]J~L~.IJ,,SO OPE~.~_,~UI~'. EACH SECTION OF TRENCH WAS EXCAVATED TO A DEPTH OF APPROXIMATELY 4' AND ~i1~ AN IN-PLACE MOISTURE/DENSITY TEST (NO. 27) WAS PERFORMED ON THE MATERIAL DIRECTLY OVER THE EXISTING UTILIW TRENCH PRIOR TO RECOMPACTION AND ONE AFTER RECOMPACTION. TEST NO. 27 INDICATED THE INSITU BACI~ILL WAS AT~J~i~OF. ASTM D 698 PRIOR TO RECOMPACTION BY PAVCO. THE CONTRACTOR HIT A WATERLINE AT ST/J~W/I~IJIIJiJ~ I~-IE CiT OF COPPELL WAS CALLED FOR REPAIRS. WE REMAINED ON-SITE UNTIL REPAIRS WERE COMPLETED. [] ~JN OUR OPINION, FiLL COMPACTION MEEI~ SPEClEICATIOI~ ~UR OBSERVATIONS AND TEST NO.IS) BF '~.~,m:;';'~~ /~ C~