SS9402C-LR 980615Compaction
Test Report
Patton, Burke & Thompson
10555 Newkirk Street
Suite 530
Dallas, Texas 75220
CLIENT
CI1Y OF COPPELL
225 PARKWAY BLVD.
P. O. BOX 478
COPPELL, TEXAS 75019
D~TE 06/15J98 JOBNO 1532~ -
RSPORTNO 7 SHEET.. I OF 2
SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS
COPPELL, TEXAS
UTILIIY TRENCH
BACKFILL OBSERVATION
-SANITARY SEWERLINE, STA. 1 +65 C~E NO~_
12 ~1'1 I~ll IC~.117£ 12.0 118.,~ 13.0 100-,- JOB N0.1532
SAIXliTARY SENVER LINE, STA. 1 +25 , CURVE NO. 5
'~3 ?n NIIC 1171~ 12_0 120.~ 11.4
SANiTARY SEWER LINE, STA. 3+60
14 51'1 ~Hn 117£ 190 120.~ 10.7 100' JOBNO. 1532
SANiTARY SEWER LINE, STA, 4+25 -
15 4n NIII'~ 1171' 120 119.5 12.2 100. JOBNO. 1532
,SANITARY SEWERLINE, STA~-1 +65- CU_~.NO~. 5
15 91'1 MII~ 117i" 12.1'1 116.5 14.7 100 JOBNO. 1532
SANITARY SEWER LINEr STA. 1 +50
17 I F, NIlE 117.£ 120 117.5 11.5 100 JOBNO.1532
,SANITARY ,SEWER LINE, STA- 1 +00 CURV!~..~O~ 5
18 1 n NHC 117.£ 12.0 117.7 14.6 100' JOBNO. 1532
SANITARY SEWER LINE, STA. 1+35. CURVE NO. 5
~o 1 13 NUC: 117.C 12.0 117.6 12.5 100. JOBNO. 1532
I BELOWTOP OF A.SPHALT
S~C~F~C~IONS: 100 % OF MAXIMUM ASTM D 698 ~
MOISTURE WITHIN % OF OPTIMUM
TVPE OF COMPACTION EQUIPMENTAND NO OF UNITS:
HAMM2210 VIBRATORY DRUM ROLLER [1)
MOISTURE ADDED BY
THICKNESS OF LIFT 8~12 - INCHES
~PE OF EARTH MOVING EQUIPMENT AND NO OF UNITS:
1845C UNI.LOADER (1) ....
THIS REPORT PRESE NTB OPINIONS FORMED AS A RESULT OF OUR OBSERVATION
OF FILL PLACEMEN~ AS WELL AS THE TESTS SHOWN ABOVE WE HAVE RELIED
UPON THE CONTRACTOR TO APPLY THE NECESSAr~Y COMPACTIVE EFFORT AND
MOISTURE TO ACHIEVE SPECIFIED COMPACTION DU RING TIMES WHEN OUR
OBSERVER IS NOT PI~ESENE AND AT LOCATIONS OTH ER THAN THOSE TESTED
TEST DATA ARE NOT THE SOLE J~,SIS FOR OPINIONS ON WHETHER THE FILL MEETS
SPECIFICATIONS
PROGRESS REPORT AS REQUESTED, PBT MADE A SITE VISIT TO OBSERVE AND TEST THE UTIIIY TRENCH
RECONSTRUCTION. A RED-BROWN CLAYEY SAND WITH GRAVEL BACKFILL MATERIAL WAS ~LACED IN THE
PREVIOUSLY EXCAVATED TRENCH BEINVEEN STA. 0+75 AND STA 1 +80, 3+30 AND 4+56~ EACH 6" LIFT OF
MATERIAL WAS COMPACTED UNTIL A MINIMUM OF 100% DEN$11YWAS OBTAINED. GARRETH CAMPBELL WITH THE
CITY OF COPPELL INFORMED PBT THAT THE SECTION OF TRENCH AT "1~"~'~ Of: BETHEL ROAD AND
PARK STI~ET IS TO REMAIN IN PLACE. [CONTINUED ON SHEET 2 OF REPT.//'7]
ou. o..,O..LL NO.,S, ?
[] ~N OUR 0~,~0~. ~LL CO~ ~CZ~O, DOES NOT M~ SPEC~E~qg16~,~ ~N~ .,~',L!TE~'~"~ ,~;'~S~RV^~ONS AND T~S~ NO-IS~
AND SHOULD BE REWORKED ~ .,' ~ ~'i~'
SCOPEOfOBSERVATION: ~XIJLLTIME; [~' PERIODIC, ONC~L~'B~6t$;'~]~N~l~k~19.1~'~'~UENT'SREPRESENTATIvEADVjSED DWIGHT(PAVCO]
_ BOB DYGERT
FIELD I~EP~ESENTATIVE
BR
Compaction
Test Report
Patton, Burke & Thompson
10555 Newkirk Street
Suite 530
Dallas, Texas 75220
CLIENT:
CIT~ OF COPPELL
225 PARKWAY BLVD.
P. O. BOX 478
COPPELL, TEXAS 75019
DATE _ 06/15/98 JOBnO -1532
REPORT NO 7 SHEET 20F 2
SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS
COPPELL, TEXAS
UTILITY TRENCH
BACKFILL OBSERVATION
LABORATORY FIELD
TEST DEPTH TEST MAX OMC DRY MC COM-
SANffARY SEWER LINE, b'TA. ] +65 CURVE NO. 5
_o0 9.fl NUC 117.C 12.0 117.9 14.6
,SANITARY ~Er LINE, STA. 1+6Q CURVE NO. 5
21 90 NUC: 117.(~ 12.0 117,9 14.4 100. JOBNO. 1532
SANrrARY SEWER LINE. STA. 1_+65 CURVE NO. 5
,~,~ I 5 NUC 117X] 12.Q 117.1 14.1 100 JOBNO. 1532
sANrrARY SEWER UNE, STA. 4+50 CURVE NO. 5
~,~ 3.~ NUC 117.0 12.0 118.CI 13.1 100-~JOBN~.~;i532
SANITARY SEWERLINE, STA. 4+10 CURVE NO. 5
,~A 3.5 NUC 117.0 12.0 119.6 11.2 100- - JOB NO. 1532
,SA.N~ARY SEWER LINE, STA. 1 +60 CURVE NO. 5
25 .75 NUC 117.0 12.Q 116.8 13.6 100 JOBNO. 1532
Yo O MAXIMUM ~ D 698 _
MOIS~"E WITHIN % OF OPT[MUM
~PE OF COMPACTION EQUIPMENTAND NO OF UNITS:
~M ~10 ~B~TORY DRUM ROLLER (1 ]
MOISTURE ADDED BY
~E OF ~TH MOVING EQUIPMENT AND NO OF UNITS:
1845C ~-L~ER ~]]
THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION
OF FiLL PLACEMENt AS WELL A~ THE TESTS SHOWN ABOVE WE HAVE RELIED
UPON THE CONTRACFOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND
MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN ~UR
OBSERVER IS NOT PRESENT AND AT LOCATIONS OTHER THAN THOSE TESTED
TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHEFHER THE FILL MEETS
SPECIFICATIONS
PROGRESS REPORT [CONTINUED FROM SHEET 1 OF REPORT NO. Z}' PRIOR TO THE RECOMPACTION OF THE TRENCH
BOTTOM, A MOISTURE/DENSITY TEST WAS PERFORMED AT ST.A, ~+40.~ THE DRY UNIT WEIGHT OF THIS MATERIAL
AT THIS LOCATION WAS 101.5 PCF AT 11.8% MOISTURE. AFTER A MINIMUM COMPACTION EFFORT WAS APPLIED,
A 2ND TEST WAS PERFORMED AND A DRY DENSITY OF 110.0 PCF AT 10.5% MOISTURE WAS OBTANED. THE
PROCTOR VALUE USED FOR THE MATERIAL. BEING TESTED [LT. BROWN & TAN SAND) WAS 114.4 PCF AT 6.6%
MOISTURE [VALUE FROM THE ORIGINAL CONSTRUCTION]. THE COMPACTION PRIOR TO RECOMPACTION WAS 89% AND
96% AFTER RECOMPACTION.
~ ~'~1 OUR OPINION. FILL COMPACTION MEETS SPECIFICAT ONS A,~.~t~I~ B~-~ ~BSERVATIONS AND TEST NO TS) 2 -25
""DS,OU D,ER "O,.O . -- . /"' '"-- '""'
O,BOFO.,RV',T,O. X L,T,ME: DW GHT(PAVCO)
e-----------~ Fi J HAMM,E.,.R.~ERG ~ ~ ~ GARRETH (COPPELL)
": -^"10 :, --
rOB DYGERT co2.. .uo //_ _ .