SS9402C-LR 980615Compaction Test Report Patton, Burke & Thompson 10555 Newkirk Street Suite 530 Dallas, Texas 75220 CLIENT CI1Y OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 D~TE 06/15J98 JOBNO 1532~ - RSPORTNO 7 SHEET.. I OF 2 SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILIIY TRENCH BACKFILL OBSERVATION -SANITARY SEWERLINE, STA. 1 +65 C~E NO~_ 12 ~1'1 I~ll IC~.117£ 12.0 118.,~ 13.0 100-,- JOB N0.1532 SAIXliTARY SENVER LINE, STA. 1 +25 , CURVE NO. 5 '~3 ?n NIIC 1171~ 12_0 120.~ 11.4 SANiTARY SEWER LINE, STA. 3+60 14 51'1 ~Hn 117£ 190 120.~ 10.7 100' JOBNO. 1532 SANiTARY SEWER LINE, STA, 4+25 - 15 4n NIII'~ 1171' 120 119.5 12.2 100. JOBNO. 1532 ,SANITARY SEWERLINE, STA~-1 +65- CU_~.NO~. 5 15 91'1 MII~ 117i" 12.1'1 116.5 14.7 100 JOBNO. 1532 SANITARY SEWER LINEr STA. 1 +50 17 I F, NIlE 117.£ 120 117.5 11.5 100 JOBNO.1532 ,SANITARY ,SEWER LINE, STA- 1 +00 CURV!~..~O~ 5 18 1 n NHC 117.£ 12.0 117.7 14.6 100' JOBNO. 1532 SANITARY SEWER LINE, STA. 1+35. CURVE NO. 5 ~o 1 13 NUC: 117.C 12.0 117.6 12.5 100. JOBNO. 1532 I BELOWTOP OF A.SPHALT S~C~F~C~IONS: 100 % OF MAXIMUM ASTM D 698 ~ MOISTURE WITHIN % OF OPTIMUM TVPE OF COMPACTION EQUIPMENTAND NO OF UNITS: HAMM2210 VIBRATORY DRUM ROLLER [1) MOISTURE ADDED BY THICKNESS OF LIFT 8~12 - INCHES ~PE OF EARTH MOVING EQUIPMENT AND NO OF UNITS: 1845C UNI.LOADER (1) .... THIS REPORT PRESE NTB OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMEN~ AS WELL AS THE TESTS SHOWN ABOVE WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSAr~Y COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DU RING TIMES WHEN OUR OBSERVER IS NOT PI~ESENE AND AT LOCATIONS OTH ER THAN THOSE TESTED TEST DATA ARE NOT THE SOLE J~,SIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS PROGRESS REPORT AS REQUESTED, PBT MADE A SITE VISIT TO OBSERVE AND TEST THE UTIIIY TRENCH RECONSTRUCTION. A RED-BROWN CLAYEY SAND WITH GRAVEL BACKFILL MATERIAL WAS ~LACED IN THE PREVIOUSLY EXCAVATED TRENCH BEINVEEN STA. 0+75 AND STA 1 +80, 3+30 AND 4+56~ EACH 6" LIFT OF MATERIAL WAS COMPACTED UNTIL A MINIMUM OF 100% DEN$11YWAS OBTAINED. GARRETH CAMPBELL WITH THE CITY OF COPPELL INFORMED PBT THAT THE SECTION OF TRENCH AT "1~"~'~ Of: BETHEL ROAD AND PARK STI~ET IS TO REMAIN IN PLACE. [CONTINUED ON SHEET 2 OF REPT.//'7] ou. o..,O..LL NO.,S, ? [] ~N OUR 0~,~0~. ~LL CO~ ~CZ~O, DOES NOT M~ SPEC~E~qg16~,~ ~N~ .,~',L!TE~'~"~ ,~;'~S~RV^~ONS AND T~S~ NO-IS~ AND SHOULD BE REWORKED ~ .,' ~ ~'i~' SCOPEOfOBSERVATION: ~XIJLLTIME; [~' PERIODIC, ONC~L~'B~6t$;'~]~N~l~k~19.1~'~'~UENT'SREPRESENTATIvEADVjSED DWIGHT(PAVCO] _ BOB DYGERT FIELD I~EP~ESENTATIVE BR Compaction Test Report Patton, Burke & Thompson 10555 Newkirk Street Suite 530 Dallas, Texas 75220 CLIENT: CIT~ OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 DATE _ 06/15/98 JOBnO -1532 REPORT NO 7 SHEET 20F 2 SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILITY TRENCH BACKFILL OBSERVATION LABORATORY FIELD TEST DEPTH TEST MAX OMC DRY MC COM- SANffARY SEWER LINE, b'TA. ] +65 CURVE NO. 5 _o0 9.fl NUC 117.C 12.0 117.9 14.6 ,SANITARY ~Er LINE, STA. 1+6Q CURVE NO. 5 21 90 NUC: 117.(~ 12.0 117,9 14.4 100. JOBNO. 1532 SANrrARY SEWER LINE. STA. 1_+65 CURVE NO. 5 ,~,~ I 5 NUC 117X] 12.Q 117.1 14.1 100 JOBNO. 1532 sANrrARY SEWER UNE, STA. 4+50 CURVE NO. 5 ~,~ 3.~ NUC 117.0 12.0 118.CI 13.1 100-~JOBN~.~;i532 SANITARY SEWERLINE, STA. 4+10 CURVE NO. 5 ,~A 3.5 NUC 117.0 12.0 119.6 11.2 100- - JOB NO. 1532 ,SA.N~ARY SEWER LINE, STA. 1 +60 CURVE NO. 5 25 .75 NUC 117.0 12.Q 116.8 13.6 100 JOBNO. 1532 Yo O MAXIMUM ~ D 698 _ MOIS~"E WITHIN % OF OPT[MUM ~PE OF COMPACTION EQUIPMENTAND NO OF UNITS: ~M ~10 ~B~TORY DRUM ROLLER (1 ] MOISTURE ADDED BY ~E OF ~TH MOVING EQUIPMENT AND NO OF UNITS: 1845C ~-L~ER ~]] THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FiLL PLACEMENt AS WELL A~ THE TESTS SHOWN ABOVE WE HAVE RELIED UPON THE CONTRACFOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN ~UR OBSERVER IS NOT PRESENT AND AT LOCATIONS OTHER THAN THOSE TESTED TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHEFHER THE FILL MEETS SPECIFICATIONS PROGRESS REPORT [CONTINUED FROM SHEET 1 OF REPORT NO. Z}' PRIOR TO THE RECOMPACTION OF THE TRENCH BOTTOM, A MOISTURE/DENSITY TEST WAS PERFORMED AT ST.A, ~+40.~ THE DRY UNIT WEIGHT OF THIS MATERIAL AT THIS LOCATION WAS 101.5 PCF AT 11.8% MOISTURE. AFTER A MINIMUM COMPACTION EFFORT WAS APPLIED, A 2ND TEST WAS PERFORMED AND A DRY DENSITY OF 110.0 PCF AT 10.5% MOISTURE WAS OBTANED. THE PROCTOR VALUE USED FOR THE MATERIAL. BEING TESTED [LT. BROWN & TAN SAND) WAS 114.4 PCF AT 6.6% MOISTURE [VALUE FROM THE ORIGINAL CONSTRUCTION]. THE COMPACTION PRIOR TO RECOMPACTION WAS 89% AND 96% AFTER RECOMPACTION. ~ ~'~1 OUR OPINION. FILL COMPACTION MEETS SPECIFICAT ONS A,~.~t~I~ B~-~ ~BSERVATIONS AND TEST NO TS) 2 -25 ""DS,OU D,ER "O,.O . -- . /"' '"-- '""' O,BOFO.,RV',T,O. X L,T,ME: DW GHT(PAVCO) e-----------~ Fi J HAMM,E.,.R.~ERG ~ ~ ~ GARRETH (COPPELL) ": -^"10 :, -- rOB DYGERT co2.. .uo //_ _ .