Loading...
SS9402C-LR 980612Compaction Test Report Patton, Burke & Thompson 10555 Ncwkirk Street Suite 530 Dallas, Texas 75220 CLIENT: CEY OF COPPELL 225 PARKWAY BLVD. P. O. BOX 475 COPPELL. TEXAS 75019 DATE 06/12J98 JOBNO 1532 REPORT NO 5 SHEET 1 OF _ 1 SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILII~' TRENCH BACKFILL OBSERVATION SANEARY SEWER UNE, ST.a,, 1 + 10 ~URyE NO=2 4.0 NUC 113.5 16.0 110.3 12.7 97 JOBNO. 1532 SANITARY SEWER LINE, ~A, 14-;! 0 CURVE NO. 2 3.5 NUC 113.5 16.0 115.7 15.6 100~.JOBNO.1532 ,SANITARY 5EWER LINE, ~TA, ] ~40 CURVE NO. 2 4.0 NUC 113.5 16.0 115.5 14.5 100~.JOBNO. 1532 ~NffARY_~S_EWER _L!~E, STA,. 1+30 CURVE NO. 2 3.0 NUC 113.5 16.0 114.1 16.6 100~ JOBNO. 1532 ,~aJ',IITA~ 5~E.R L!NE, ~TA. ] +0R CURVE NO. 30C 3.0 NUC 116.3 13.6 117.0 14.8 100-~ JOBNO. 1532 ~IT~_Y ~W~R LINE,~A, 1 ±] ~ CURVE NO. 2 2.5 NUC 113.5 16.0 114.4 16.4 100-~ JOBNO. 1532 .~ARY $~EWER LINDE, STA.! ±30 CURVE NO. 2 2.5 NUC 113.5 16.01 114.6 15.4 100-~OBN~i532 1 BELOW TOP OF ASPHALT 295% OF ASTM D-698 REQUIRED SPECIFtCATIONS~ ! 00 % OF MAXIMUM ASTM D 698 MOISTURE WITHIN % OF OPTIMUM IYPE OF COMPACTION EQUIPMENT AND NO OF UNITS ~M ~]D ~BRATORY DRUM ROLl, ER(1 ) WAC~R PACKE_R CASE 1845C UNI-LOADER (1~1 THIS REPORT PRESENTS OPINIONS EORME D AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT AS WELL AS THE TESTS SHOWN ABOVE WE HAVE RELIED UPON THE CONTF'<ACFOR EO APPLY EHE NECESSARY COMPACTIVE EF FORT AN D MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER ~S NOT PRESE NI; AND AF LOCATIONS OI~HER TF{AN THOSE TESTED TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHEEHER EHE FILL MEETS SPECIFICATIONS PROGRBSS REPORT AS REQUESTED, PBT MADE A SEE VISIT TO OBSERVE AND TEST THE UTILEY TRENCH RECONSTRUCTION. THE CONTRACTOR REC~D ~I'IE BOITOM OF THE RE-EXCAVATED TRENCH BETWEEN STA. 0+76 AND ST,&. 1 +80 TO A MINIMUM ~F '~1~. TEST NO. 2 WAS PERFORMED AFTER THE CONTRACTOR RECOMPACTED THE EXISTING BACKFILL. AFTER THE PROPER DENSITY WAS OBTAINED THE GEOTEXILE FABRIC WAS PLACED OVER THE SUBGRADE. THE CONTRACTOR THEN BEGAN PLACING BACKFILL MATERIAL IN THE TRENCH IN APPROXIMATELY 8-12" LIFTS. EACH LIFT WAS ROLLED UNTIL A MINIMUM OF 100% DENSiW WAS OBTAINED. TEST NO. 6 WAS EVALUATED USING A PROCTOR VALUE AND MATERIAL DESCRIPTION OBTAINED DURING THE ORIGINAL CONSTRUCTION. 2 9 [~N OUR oPInion, FILL COMPACTION MEETS SPE CIFICATIONS._~ ~A~¥~O. BSE RVATION S AND TEST NC.TS} AND SHOULD BE REWORKED ~' *** ~ scoP, o~ O~SE~^TION: ~)~ULL T,M, l~ PEm O0,C ~.~.~?~L ~SI~"'~i~C ONT~'..~l~. O. CU BN T'S REPR ESBNTAT~VE ADV,SE 0 DAN (PAVCO) ~R J HAMMERBF~G~ .... ~ BOB DYGEET L.~_*,,, 80610 /~..~ /~-'?~ /~,,~---,_