Loading...
SS9402C-LR 980611Compaction Test Report Patton. Burke & Thompson 10555 Newkirk Street Suite 530 Dallas. Texas 75220 CLIENT: CITY OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 DATE: 06/11t98 JOB NO 1532 REPORT NO 4 SHEET SUB]ECF BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILITY TRENCH BACKFILL OBSERVATION LABORATORY FIELD TEST DEPTH TEST MAX OMC DRY MC COM- SPECIFICATIONS z 100 % OF MAXIMUM ASTM D 698 MOISTURE WITHIN . % OF OPTIMUM 1YPE OF COMPACTION EQUIPMENTAND NO OF UNrTS: MOISTURE ADDED BY THICKNESS OF UFT INCHES 1YPE OE EARTH MOVING EQUIPMENT AND NO OF UNITS: THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT ~ WELL AS THE TESTS SHOWN ABOVE WE HAVE RELIED UPON THE CONTR~Z;TOR TO APPLY I~HE NECESSARY COMPACTIVE EFFORTAND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT AND AT LOCATIONS OTHER THAN THOSE TESTED TEST DATA ARE NOT THE SOLE P~SIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS PROGRESS REPORT (CONTINUED FROM SHEET 1 OF REPORT 4) THE CONTRACTOR AND THE ClIY (KENT COLLINS) WAS ADVISED THAT AN ADDITIONAL SECTION OF ROAD SHOULD BE REMOVED TO DETERMINE THE EXTENT OF SETTLEMENT. IT SHOULD BE NOTED THAT THE AREAS OF SEll'LEMENT WERE IN AREAS WHICH WATER HAD BEEN ALLOWED TO POND AFTER THE PREVIOUS NIGHT'S RAIN. THE MATERIAL PLACED IN THE ORIGINAL TRENCH APPEARS TO HAVE BEEN PLACED WITH VERY LrlTLE COMPACTIVE EFFORT. IN SITU DENSITY TESTS COULD NO BE PERFORMED ON THIS MATERIAL BECAUSE OF THE PONDED WATER IN OUR OPINION, FILL COMPACTION MEETS SP ECIFI CATI~9.~,~#~E D BY OUR OBSERVATIONS AND TEST NO.{S) ,N ou.o .,oN` F'LLCO"PACT'ONDOESNOT.E m < .' C^TED.YOUR O,SE.VAT,ONSANDTESTNO S, AND SHOU~ BE R~OR~D ~ ~.. A % ~ J~ ~. ......... X.Z .......... i~.~ KE~ [COPPELL] ~ ~, J, HAMMERBERG ~a,,m Bu~m~ BOB DY~ERT . ~.~ 806~ ~. ~~=~-~ ~ Compaction Test Report Patton, Burke & Thompson 10555 Newkirk Street Suite 530 Dallas, Texas 75220 CLIENT: CITY OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 DATE 06lt "~/95 JOB NO t5,32 REPORT NO 4 SHEET 1 OF _ -2 SUBJECT BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELL, TEXAS UTILITY TRENCH BACKFILL OBSERVATION SPECIFICATIONS:.. 1(~ % OF MAXIMUM ASTM D 698 MOISTURE WITHIN °/o OF OPTIMUM ~{PE OF COMPACTION EQUIPMENTAND NO OF UNITS: MOISTURE ADDED BY THICKNESS OF LIFT _ INCHES TYPE OF F~ARTH MOVING EQUIPMENT AND NO OF UNffS THiS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENI, A~ WELL AS THE TESTS SHOWN ABOVE WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORTAND MOISTURE TO ACHIEVE SPECJHED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT AND AT LOCATIONS OTHER THAN THOSE TESTED TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS PROGRESS REPORT A~ REQUESTED, PBT MADE A SITE VISIT TO OBSERVE AND TO TEST THE UTILITY TRENCH RECONSTRUCTION. THE CONTRACTOR CONTINUED TO EXCAVATE MATERIAL FROM TPJE TRENCH BE~I~,EEN ~$i'A. 4+50. JHE TRENCH WAS EXCAVATED 4' FROM TOP OF ASPHALT AND~~. UPON ARRIVAL TO THE PROJECT SITE, PBT OBSERVED THE SEI'rLEMENT OF MATERIAL ALONG THE EXISTINg-; TRENCH AT 5TA. O+75, WHERE THE EXISTING ASPHALT FOR THE EAST BOUND LANE WAS STILL IN PLACE. THE EXISTING TRENCH HAD SE1TLED TO A POINT THAT THE MATERIAL UNDER THE ROAD HAD CAVED IN. [CONTINUED ON SHEET 2 OF REPORT NO. 4]. [] IN OUR OPINION, FILL COMPACTION MEETS S P E CI.~.~, ,1~ AS/~kD I~'A~'~% _l ,~ ~)~ R OBSERVATIONS AND TEST NO,IS) ,. ou, oP,N,oN, E'LL¢O PACT'ON DOES NOT. . PEC' OU" OBSERV^T'ONS AND TESF.O. S AND SHOULD BE REWORKED 1' *" ~ *~ SCOPEOFOBSERVATION' [J U. TIME' [] PE~I'**~*'%' ....................... 'I~CTOR'SORCLIENTSREPRESENTATNEADVlSED DAN PAVCO I o'.. ~, ~...' ~'~' FIELD ~£PJ~SENTATIV~ '~1~:1~/0 N AL %~'"'" ^~r~°v~ ~RD J. ~"~'-"-'"'"'-~ E B F