Loading...
SS9402C-LR 980608Compaction Test Report Patton, Burke & Thompson 10555 Newkirk Street Suite 530 Dallas, Texas 75220 CLIENT: CITY OF COPPELL 225 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 DATE 06/08/98 JOB NO 1532 REPORT NO 1 SHEET 1OF l SUBJECE BETHEL ROAD SEWER LINE BACKFILL REPAIRS COPPELt, TEXAS UTILIff TRENCH BACKFILL OBSERVATION LABORATORY FIELD TEST DEPTH TEST MAX OMC DRY MC NO. LOCATION FEET IYPE DENSITY % DENSITY % PACTION SOIL TYPE PCF [:CF % SPECIFICATIONS: % OF MAXIMUM MOISTURE WITHrN % OF OPTIMUM IYPE OF COMPACTION EQUIPMENTAND NO OF UNrTS MOISTURE ADDED BY THICKNESS OF LiFT INCHES ~PE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: ~IS REPORT PRE SENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF ElL L PLACEM EN1, A~S WE LL AS THE TESTS SHOWN ABOVE WE HAVE RELIED U PON THE CONTRACTOR TO APPLY 1~ E NECESSARY COMPACTN/E EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENE AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT TNE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS PROGRESS REPORT AS REQUESTED, PBT MADE A SITE VISIT TO OBSERVE THE REMOVAl. OF ASPHALT AND CEMENT TREATED BASE FROM THE EAST BOUND LANE OF BETHEL ROAD. APPROXIMATELY 8.5 - 9" OF MATERIAL WAS REMOVED USING A BITELLI $F2002 RECLAIMER. THIS MATERIAl. WAS TRANSPORTED TO TXI CTB PLANT ON BELTLINE ROAD FOR PROCESSING AND STORAGE. Pat t0n~k~ FIELD r~EPRESENTAT1VE APPROVED B¥~ RIC,~RD J. HAMMERBER~.~ BF