Loading...
ST9302-CS 951017Rady & Associates A division of Kimley-Horn and Associates, Inc. Engineering Planning and Environmental Consultants October 17, 1995 Mr. Ken Griffin, P.E. City Engineer City of Coppell P.O. Box 478 Coppell, TX 75019 Proposal for Accelerated Moore Road Bid Phase Sandy Lake Road R&A No. 06940600 (93021) 10-18-95A09:40 · 91o Collier Street Fort Worth, Texas 76102-3542 Dear Ken: An accelerated design/bid/construction schedule for that portion of Sandy Lake Road on either side of Moore Road can be accomplished. Rady and Associates proposes to perform the engineering services for a lump sum amount of $10,000, provided that the entire project from Denton Tap Road to MacArthur Blvd. is approved for preliminary design. The professional services will be performed in conjunction with our current design services for Sandy Lake Road. Administratively, this work will be managed as a modification to our existing agreement and controlled under a unique task number. The City of Coppell may accept our proposal by signing at the end of this letter and sending one copy to Rady & Associates no later than December 31, 1995. Rady may extend this date by a reasonable time period if requested by the City. Our proposal considers several complicating factors which must be addressed when establishing a schedule for the project. The preliminary design must be completed for a considerable distance either side of Moore Road. Otherwise the amount of transition work may be extraordinary. The water transmission main to Flower Mound will be removed from service twice. Hopefully, the second time will occur after Flower Mound has secured a second supply source from the Upper Trinity Regional Water District. · TEL 817 335 6511 MET 817 654 4266 FAX 817 335 5070 Rady & Associates A division of Kimley-Horn and Associates, Inc. Mr. Ken Griffin, P.E., October 17, 1995, Page 2 Most franchise utility relocations will require two phases. This may be avoided by coordinating preliminary design completion with the utilities overall relocation program phasing. We recommend a coordination meeting with all utilities prior to the final design of the Moore Road section. Accelerated construction will require construction of the storm drain system in Moore Road north of Sandy Lake Road which has already been designed by the Coppell Engineering Dept. Coppell's transmission main in the Moore Road intersection will remain idle until completion of the entire Sandy Lake Road project. The subsequent contractor must retest and redisinfect this portion before placing it in service. This contractor should not be expected to unduly carry the burden of any faults in this line without due compensation. This will probably result in extra isolation valves to separate the contractor's responsibility associated with new and existing facilities. Rady & Associates stands ready to serve at your direction. Respectfully Submitted, RADY & ASSOCIATES A division of Kimle~-Horn and Associates, Inc. Lee K. Allison, P.E. Charles M. Staples, P.E. LKA:hc P:\93021,00\93021LTR'~ACCB1DPH,WP Accepted by the City of Coppell. Signature Signature Name Name Title Title Date Date