Loading...
MA0405-CS040427 (2)veri n 2094 Mc Gee Lane Lewisville, TX 75077 April 27, 2004 City of Coppell Suzan C. Taylor CIP Coordinator Engineering Department RE: Brick Paver Replacement Program Dear Ms. Taylor, I have reviewed the plans for the above mentioned project and have indicated on the utility plans provided to us where in the intersections our plant exists. These are approximations for reference only; cable locations must be done to verify exact locations on site. I do not believe from my findings we will conflict with the work in this project. Let me know if you have any questions. Thank you, Verizon Engineer Network Engineering OSP 972-318-0656 Email- karen.guiloreza@verizon.com Enclosures (LllnOS) AYMN~I¥c139YI'11A ~ O~IVA~'IN08 ~INHI~VOVI/~ ::IAI~IQ aoaNo0 ~ aaYAalrloB S~LLI]II fl ONI*IOWDW3ONR OVO~I 'IOOHOS -I=IH.L3fl ~ O~lVA3'lnO8 ~IrIHIEIVOV~ 0N3039 oApO Jopuoo Ii ~0-~0 V~ ~AI~JQ ~gVqqlN O~VA~INO8 1~N~4¥S ~ O~JYA~INO8 ~JNH m ~JVOYV4 iii NOLL~¥3 iii (q~JON) ,LYM)t~¥,::t '~E)V-I-IIA ~ O~JVA3-1N08 ~NHI~IVOVIN lp, JON ,~e~Ued ~;ell~ ~