ST9302-CS 951010· SANDY LAKE ROAD PRO~..~ October 10, 1995 AGENCIES/CONSULTANT COORDINATION CONFERENCE AGENDA & NOTES of CoDpell Project 91-830: 11. Alignment Issues: Is there still an issue about exactly where the City wants the alignment? - Bike Lane Issues: Also, has City responded to 8-31-95 letter from County which attached concerns by consultant for the bridge project? Drainage Issues: Have we now provided drainage plans, even if only "very preliminary" to Ken Griffin with the City of Coppell? Horizontal Control: Is there still a question about field control for this project? Preliminary ~stimate: This information has now been provided to Dallas County by the consultant. Preliminary Plan Submittal: Does the date for submittal depend on City resolution of desired alignments? Right of Way Issues: Has City of Coppell now written to the County requesting that the County consider acquiring right of way, at City cost? Preliminary Plan Submittal: Are we ready to designate preliminary plans? a submittal date for IJll 'ri] I T J"' T City of Dallas. Brid~e Pro4ect 91-838;~ ,~. ROW I~.s: Issues at west end of project have been resolved. The proposed date for submitting plats and deeds is when? be Issues at east end of project. We are unable to change the plans to avoid the need for ROW from Stiles and the Nursery property. The most urgent question to resolve is; should we obtain a "right of entry", in the very near future from each of the two properties, for purposes of building this bridge project's permanent pavement and the temporary asphalt transitions using the preliminary ROW map provided by Kimley Horn? The second question is who (City of Carrollton) should obtain these "Right of Entry's".? 2. Survey Control: Previously, the consultant needed survey field data (from Dallas County) in order to design the storm sewer from Kimley Horns project that will discharge into the~ Elm Fork. Dallas County, however, needed centerline control in order to obtain the field data. The control has now been provided by the consultant. The County is currently obtaining the performing the field work and is scheduled to provide the data to the consultant by the end of this week. 3. Construction Estimate: This information has now been provided by the consultant. Some changes may be recommended. Irv will get these to consultant by end of this week. Drainage Information from adjacent projects: Does Gojer now have ~ all the needed drainage information (~, pipe size and flow line elevations) from consultants at both ends of the project? 5. Invoice Regarding Gojer's invoice recently received, Irv needs to see current plans before verification of payment. 6. Contract Documents. High Density Disk with new contract documents prepared in Wordperfect 5.1 is being provided the consultant this date. 7. Next plan submittal: Are we able to determine a schedule date for submitting plans "adequate for utility relocations", also for final plans and contract documents? 2 Ce City of Carrollton Park Improvement PrQ~ct: 1. Drainage Swale: Preliminary plans have now been provided. Does Gojer now have enough information (relative to park improvements) to finish Sandy Lake Road plans? Also, what is the status of checking and providing comments back to Schrickel Rollins? 2. Status of Geotechnical work: Submittal letter with preliminary plans that was provided to Dallas County indicated report was attached. The report, however was not received. Do City of Carrollton Project 91-839: 1. Right of Way Acquisition; City has requested Dallas County consider acquisition (at city cost); any report on status of reply? See Topic B.l.b. concerning Stiles and Nursery properties. c. Any issues with Amusement Park Property? Drainage information: Status or proposed design information. schedule for submitting drainage Preliminary Paving and Drainage Plans: Proposed date for next plan submittal is when? E. Road and Bridge District #1 Topics: Detour construction: County has or can obtain materials for this work· Possible temporary access for Park entrance: County has or can obtain materials for this work. Also, we need to build to ultimate grade and alignment if possible.