ST9302-CN040430I I ! PROJECT: CONTRA CTOR: OWNER: CHANGE ORDER: CITY OF COPPELL CHANGE OR EXTRA WORK ORDER SAND Y LAKE ROAD PROJECT # ST 93-02 ED BELL CONSTRUCTION COMPANY CITY OF COPPELL #9 DA TE: 04/30/04 Item I Quanti02 [ Unit l aescription I Un, Price [ Total Price ADD: ADA Modi etcations 1 LS 4.3.7 Accessible Routes/Slope 44,614.78 $44,614.78 1 LS 4.7.2 Curb Ramps / Slope 8,769.72 8,769.72 1 LS 4.7.4 Curb Ramps / Surface 17,100.00 17,100.00 1 LS 4.27.2 Clear Floor Space 530.00 530.00 1 LS Barricades, Signs & Traffic Handling/10 Days 500/per 5,000.00 day 1 LS Message Boards for Rework 2 ~ 1 mo. 5,412.50 5,412.50 1 LS Staking/Layout/Slope Verification/40 hrs 95/hr 3,800.00 Subtotal $85,227.00 ADD: Concrete Collars for connections between storm sewer lines 8 EA Concrete Collar for 21"RCP 400 $3,200.00 1 EA Concrete Collar for 24" RCP 445 445.00 8 EA Concrete Collar for 36" RCP 530 4,240.00 Subtotal $7,885.00 ADD: Conduit for TXU Electrlcal Feeds 80 LF Bore Conduit (TXU Feed) 18.75 $1,500.00 1 EA Install Pull Box (TXU) 300.00 300.00 Subtotal $1,800.00 Net Increase $94,912.00 TOTAL CHANGE ORDER #9 [ $94,912.00 Previous Contract Amount Total Change Order #9 Revised Contract Amount Net Increase in Contract Time of Completion Revised Contract Time of Completion $9,917,162.70 $94,912.00 $10,012,074.70 N/A 1067 Days The contractor hereby accepts this contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason for this revision to the Contract. Rectomme?d}~ City Engineer Date Accep~r~l/by City of Coppell Date Agreed >yContractor Date