Loading...
ST9302-CS040430T H £ C I T Y 0 F April30,2004 Steven Priddy Ed Bell Construction 10605 Harry Hines Blvd. P.O. Box 540787 Dallas, TX 75354-0787 Re: Sandy Lake Road Project # ST 93-02 Change Order #9 Dear Mr. Priddy: Enclosed are three (3) originals of Change Order # 9 for ADA modifications, connections between storm sewer lines and TXU electhcal feeds. This change order was approved at the April 30, 2004 Council meeting. Please execute all three originals and return two to the City of Coppell Engineering Department. Should you have any questions or need any additional information please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office 972/304-3686 Fax 972/304-7041 E-mail kgfiffin@ci.coppell.tx.us cc: Garreth Campbell, Inspector 255 p~RKWAY ~¢ PO ~OX 9478 Cf COPPELL 1X 750! 9 ~- FEL 972/4f~? 0022 ~r FAX 972/304 3673