Loading...
Coppell Ind 2-PT040507T H [ * C I T Y · 0 F COFFELL EARLY GRADING / EXCAVATION PERMIT IN RIGHT-OF-WAY / EASEMENT / PRIVATE PROPERTY Grading plans provided and approved. (Erosion Control must be installed prior to beginning work) Tree Removal Permit required. GAl Hold Harmless Letter from the Property Owner/Engineer/Developer is attached. General Description of work (provide copy of approved p!ann): / P W~ contact ~de ~ Ci~ ~or U~ Com~ to l~te e~g u~fi~? if NO, Reason: f/G/~/L ~ //4/~/Z~/~ Z~'-~/A/A///¢/~-' CTYES~¢o if NO, Reason: .A/o ~-,,'~2' /~.,¢.t~/J~- fA,/-.f/~ ~ Is removal of existing street, alleys, or sidew,*lk~ necessary? if YES, Attach Bore/Street Cut/Saw Cut Permit ~ Is Floodplain Permit required? if YES, Permit ii or date of City Council varianc~ Was contact made with Leisure Services Dept. concerning Tree Removal Permit? YZS CTYV-S /~qo CTY S Earl~ Gradin~ / Excavation Permit Pa~e2 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests will be required at the applicant's expense), Tree Ordinance and barricading according to the Texas Manual on Uniform Troffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). Any work requiring closing of a lane of traffic, street, or alley must be approved by the Engineering Dept. with notification to the following prior to dosing: Police Department O 972-304-3600 Fire Department O 972-304-3500 Street Department O 972-304-3-~M6 F.n~neering Department O 972-304-3679 Attach barricade plan / trench safety plan of a lane or street closure is required. Note: Street closures are allowed from 9:00 a.m. until 4:00 p.m. ONLY unless otherwise approved by City Engineer. A 2% inspection fee for grading is required prior to be~i~'nning work. (Attach copy of excavation contract for verification) Amount Due: Date Paid: permit. Sl~gnatu-r/e of Applicant/Cot(tractor Rep. City inspector must be notified 24 hours prior to be~'nning work related to this Signature of City Representative Printed Nan~ · Da{e Printed Name Date City Inspector for this project Contact Number(s) Applicant shall indemnify and for~er hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. MAY-lO-2004 ~ON ]2;33 PM RE OU?P COSTRUOTION FAX NO, 8174859591 ?, O] R. E. Cupp Construchon, L.P. 6646 ladustrial Park · Suite C · Ft. Wol'th, TX 76180 l,,'xcavatiot~ & Lime 9tabih'zation Office 817-485-9588 · Metro 817-498-4001 · Fax 817-485-9591 Friday, March 5, 2004 Ilillwood Construction Services Three 1.,iacola Centre 5430 LBJ Freeway, Suite 800 [)alias, TX 75240 Phone: 9'72-201-2930 Fax: 972-201-2929 All: Ralph Rucker Re: Torch (Coppell) Wc propose to famish labor, inalerials and equipment on the above referenced project, WORK TO INCLUDE: Engineering Strip & Grub, Stockpile Cut and Fill Site Moisture Condition Pad Lime Building Pad 8" 6"% Fine Grade Paving Pier Line Excavation Respread Topsoil & Backfill Curbs Channel Excavation & Place Onsite FOR TI'I F- $UM OF: $ 300,000.00 ' '1 ' S EX(- ,USION,: ASBI~;S'I'OS SURVF, Y & ABAII~,MI';NT, EXPORT POST INJECTED MA'I'I~.P. IAI,S FROM BUI[,I)[NG OR PAVING AREAS, EXPOW[' O1:O'111ER SUItCONTRACTORS SPOILS, SIDI".WAI.K EXCAVATION, I,OCATION OF UTII,ITIES, EROSION CONTROL O'IltI';R 'rlIAN SI LTI~'ENt;E, BACKFII,L OF CURBS, BARRICADES, ROCK EXCAVA'IION, S'[RUCTURAI. F;XCAVATION, S'I~RUCTURAL ItACKFII,I,, ~ ESTING, PERMITS, BONDS, I:I,AGMIgN, POOL [',XCAVATION, UNDERGROUND TANK REMOVAl., }lAY IIAI,ES, SANDBAGS, INI,ET PROTECTION, RF, MOV^L & CAPPING OF UTILITIES, IIAZARDOUS MATERIAl. REMOVAL, RFMOVAI. OF UNKNOWN FOUNDATIONS. GRAI)E BEAMS, AND TANKS, P, EMOVAI, OF UNSUITABI,E MA3ERIAI.S, PROVIDE WATER M EEF. R NOT[*,: Price good for 30 clays & please make this proposa! an attachment or exhibit to conh'ac£. P,.E. CUPP CONSTRUCTION Ilyaa Pollard/Vice Prcsidont Hillwood Investment Properties, L.P. Three Lincoln Centre 5430 LBJ Freeway, Suite 800 Dallas, Texas 75240 (972) 201-2800 BANK ONE, N.A. DALLAS, TEXAS 178167 Check No. 00053535 SIX THOUSAND AND 00/100 ................................ * ..... *********** ........ Pay To The Order Of: City of Coppell PO Box 9478 255 Parkway Coppell TX 75019 Date I Amount 5/5/2004 $ ..... 6,000.00 Void If NO~ Cashed in 90 Days BY DOLLARS AUTHORIZED SIGNATURE