Loading...
ST9301-CS040510Suzan Taylor Page 1 of 1 From: "Pembroke, Bill" <BilI.Pembroke@jacobs.com> To: "Suzan Taylor (E-mail)" <staylor@ci.coppell.tx.us> Date: 5/10/2004 8:54 AM We will be ready to turn in final plans on Wednesday. Are you, Garreth, and Keith available for a meeting around 3:00PM. Based on our current design, the second and third driveways into the vacant shopping center will have to be modified. Using a maximum grade of 14% (City of Dallas max.) the driveways will encroach upon the top of the box culverts 10' and 15'. Our structural engineers feel they can make a satisfactory tie in to allow this connection without drastically altering the box culverts. I will fax you a drawing this afternoon for a quick review. William G. Pembroke, P.E. Senior Project Manager Jacobs Civil Inc. 6688 N. Central Expressway Suite 400, MB 13 Dallas, TX 75206-3924 ph: 214.424.7500 dir: 214.424.7591 fax: 214.696.3499 bill ,pembroke@jacobs corn NOTICE - This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying or distribution of, or reliance on this message by unintended recipients is strictly prohibited. If you have received this message in error, please notify us immediately by replying to the message and deleting it from your computer. file://C:~Documents%20and%20Settings\staylor\Local%20Settings\Temp\GW} 00001 .HTM 5/10/2004