Loading...
Brighton Manor-LR040507Construction Materials Testing and Environmental Consulting Texas 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-69 REPORT OF CONCRETE MIX OBSERVATION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: May 7, 2004 Street Custom Homes Brighton Manor ~ Guzman Construction LMC #3 Manholes - walls Date Concrete Placed: April 30, 2004 Stund~d 6"x12" Area 28.27 Square Inches Conc~te Report No.: 1 PmjectNo.:204-0126 MATERIALS So.~ sso ~.,.~ w,.. OBSERVATION DATA Mix Number: 1701 Time Sample Batched: 04:06 pm Cement: Time Sampled: 04:42 pm 2 manholes - NE corner of, Fly Ash: Sample Location: Truck/Ticket No: 1096/3177460 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 85°F Fine Aggregate: Concrete Range: 87°F Admixtures: Slump Range (inches): I'A" Weather Conditions: Cloudy I Time Started: 02:30 pm 2 Time Completed: 06:00 pm Added Water: 0 gallons Sample Air Content (%): 3 2% Total Cubic Yards Placed: 4.5 4,200 BM 2 05/28/04 BM 3 1 W' 28 05/28/04 BM 4 H HOLD ~.STM C-3 I.C-39.c-1a3 (Unlals ~o,~ Othen~) ~,~ylinders Made By: Eh Remarks and/or Distribution: cc: Mr. Jim Street- Street Custom Homes Mr Larry Davis - City of Coppell Mr. Rodney Louviere - Fax: 972-931-6787 Texas CMT, Inc. Reviewed by: Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 o (214) 352-6957 Fax (214) 352-6972 www .texascmt.com REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Densit~ Report No. 3 (204-0126) Method: ASTM D2922 D3017 D698 Pa~e I of 3 Client: Street Homes Material Descnp0on Maximum Optimum Dt3' Moisture Density Content Project: Brighton Manor (Lba/CuFt) Percent Test Date: May 4, 2004 L Olive Gray Sandy Clay 103.9 19.0 2. Yellowish Orange Clayey Sand 117.6 12.8 3. Dark Brown Clay 95.8 24.0 Report Date: May 7, 2004 4. Light Brown Clay 93.9 24.0 5. Yellowish Orange Clayey Sand 120.2 11.3 6. Gray Shale 98.1 19.5 Required Density (%): Min. 95% Required Moisture (%): Opt. 4-2% Mat Location/Elevation (and/or) Lift in-Place In-Place Percent Test No. D~ Density Moisture Compaction No. (Lbs/CuFt) Content (%) Depth 6 Final - 8" sanitary sewer line B - Hood Drive 41 Station 1+50 98.4 21.5 100.3 3 Final - 8" water line - Hood Drive 42 North of Block B, Lot 7 95,2 22.8 99.3 3 Final - 8" sanitary sewer line B - Hood Drive 43 Station 3+65 97.2 26.3 101,4 3 Final - 8" water line - Hood Drive 44 North of Block B, Lot 6 96.1 26.3 100.3 6 Final - 8" sanitary sewer line B - Hood Drive 45 Station 5+00 101.4 21.5 103.3 3 Final - 8" sanitary sewer line C - Hood Court 46 Station 1+70 98.8 25.3 103.1 3 Final - 8" water line - Hood Court 47 East of Block B, Lot 2 98.7 26.0 103.0 3 Final - 8" water line - Duncan Drive~9~8,.9 48 6" West of Block C, Lot 9 94.8 26.0 * Test results do not meet project specifications TEXAS CMT, 1NC. DALLAS, TEXAS (214) 352-6957 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 3 (204-0126) Method: ASTM D2922 D3017 D698 Pa~e 2 of 3 Client: Street Homes Mate~al Descri@tlon Maximum Optimura Project: Brighton Manor (Lba/CuFt) Percent Required Density (%): Min. 95% Required Moisture (%): Opt. ~2% 1 Final - 8" sanitary sewer line A 49 East of Block B, Lot 8 on Duncan Drive 103.5 19.5 )9.6 3 Final - 8" sanitary sewer line A 50 East of Block B, Lot 10 on Duncan Drive 97.4 24.0 101.6 3 Final - 8" water line 51 West of Block C, Lot 6 on Duncan Drive 98.3 22.6 102.6 I 8" water line - 2' below grade 52 West of Block C, Lot 6 on Duncan Drive I00.3 20.l 96.5 53 West of Block C, Lot 6 on Duncan Drive 98.9 25.5 103.2 1 8" sanitary sewer line A - 2' below grade 54 East of Block B, Lot 10 on Duncan Drive 108.9 20.7 104.8 3 8" sanitary sewer line A -1' below grade 55 East of Block B, Lot 10 on Duncan Drive 99.2 23.6 103.5 3 8" sanitary sewer line A - 2, below grade 56 6" East of Block B, Lot 8 on Duncan Drive 96.3 26.0~00.5 3 8" sanitary sewer line A -1' below grade 99.4 57 6" East of Block B, Lot 8 on Duncan Drive 23.9 1~7 * Test results do not meet project specifications TEXAS CMT, INC. DALLAS, TEXAS (214) 352-6957 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 3 (204-0126) Method: ASTM D2922 D3017 D698 Pa~e 3 of 3 Client: Street Homes Material Description Maximum Optimum D~ Moisture Project: Brighton Manor (Lbs~CuFt) Pement Test Date: May 4, 2004 l. Yellowish Orange Clayey Sand 117.6 12.8 Report Date: May 7, 2004 4. Light B~own Clay 93.9 24.0 Required Density (%): Min. 95% Required Moisture (%): Opt. 4-2% Tes~ (Lbs/CuFt) Content (%) 3 8" water line - 2' below grade 58 West of Block C, Lot 9 on Duncan Drive 95.8 25.0 100.0 3 8" water line - 1' below grade 59 West of Block C, Lot 9 on Duncan Drive 99.5 22.4 103.8 3 8" sanitary sewer line B - 2' below grade - Hood Drive 60 Station 1+50 91.2 30.4 * 95.1 3 8" sanitary sewer line B - 2' below grade - Hood Drive 61 Station 3+60 90.8 30.0 * 94.7 * 3 8" water line on Hood Drive - 2' below grade 62 South of Line B, Station 3+60 98.6 24.4 102.9 3 8" water line on Hood Drive - 1' below grade 63 South of Line B, Station 3+60 95.3 26.0 99.4 4 8" sanitary sewer line C - 2' below grade - Hood Court 64 Station I+70 92.4 25.3 98.4 3 8" sanitary sewer line C - 1, below grade - Hood Court ~ 65 6" Station 1+70 94.5 26.0~98.7 3 8" water line - 2' below grade - Hood Court 66 91.3 30.3 * ~5.3 ........ · Test results do not meet project specifications ~ ~'~ ~ M~. La~y Davis - City of Coppell Mr. Rodney Lonvie~e - Fax: 972-931-6787