Loading...
Coppell Ind 2-CS040408Ken Griffin - Project Torch From: To: Date: Subject: CC: "Jarrell, Albert" <albert.jarrell~hillwood.com> · ' X US m '"Kenneth M. Griffin (kgnffin~c~.coppell.t . ) <kgriffin~ci.coppell.tx.us> 4/8/2004 10:14 AM Proj oct Torch "Herold, Preston" <preston.herold~hillwood.com> Ken, Thanks for taking our call yesterday about the Project Torch prospect for Tradepoint. In addition to the 60,000 gal/hr of water and 300,000 gal/day of sewage, the prospect has requested info on the following: Can you forward to the appropriate persons for an answer? 1. A copy of the Coppell Industrial Sewage/Waste Pre-treatment Ordinance I)-~ 2. A copy of the Zoning Ordinance for Tradepoint 3. Any Coppell related requirements for a Central Ammonia Refrigeration System 4. Any Coppell related requirements for Boiler Rooms 5. What version of the Building Code does Coppell follow? ~.~.-t~, ~,~ ~ ,£ 6. Any emissions requirements by Coppell related to Boilers. Thanks for your help. Albert Jarrell Development Director Hiilwood Investment Properties Three Lincoln Centre 5430 LBJ Freeway, Suite 800 Dallas, Texas 75240 972.201.2971 direct 972.201.2989 fax 214.616.3153 mobile albert.jarrell@hillwood.com www.hil!woodinvestmentproperties.com www.hillwood.com r~OD {oO Ken Griffin: REi 5~e~ii~ns~regarding 5peratio~or~h developr~ni Page 1 i From; To: Date: Subject: "Jarrell, Albert" <albert.jarrell@hillwood.com> 'Greg Jones' <gjones@ci.coppell.tx.us> 4/8/2004 4:34:52 PM RE: Questions regarding Operation Torch development Thanks Greg. This is very helpful. We'll let you know if we have any other questions. Albert ..... Original Message ..... From: Greg Jones [mailto:gjones@ci.coppell.tx.us] Sent: Thursday, April 08, 2004 3:15 PM To: albert.jarrell@hillwood.com Cc: Ken Griffin Subject: Questions regarding Operation Torch development Hello, Albert, I will try to answer your questions with respect to my knowledge as the Building Official: The Zoning Ordinance is available from the Planning Department, or may be accessed on the web at <www.municode.com>. Look in Chapter 12, which is our Zoning Requirements or contact Planning. Central Ammonia refrigerant systems requirements are detailed in Chapter 1106 of the Mechanical Code and further addressed in the Fire Code in Chapter 606.11.3. Boiler rooms are required to be separated by one-hour construction when the largest piece of equipment exceeds 400,000 Btu. Coppell is under the International Codes, 2000 editions, except for the 1999 NEC. I am not aware of any boiler emission requirements, although you might check with the EPA. For Industrial Waste/Pre-treatment, TRA is the entity that will regulate uses involving ammonia. I hope this quick list addresses your questions. If you need further information, contact me directly at 972.304.3506 CC: Ken Griffin <KGRIFFIN@ci.coppell.tx.us>, "Myhre, Clayton" <clayton.myh re@hillwood .com> Ken Griffin - FW: Project Torch Impact Fees at Tradepoint Page ! i From: To: Date: Subject: "Jarrell, Albert" <albert.jarrell@hillwood.com> 'Ken Griffin' <kgriffin@ci.coppell.tx.us> 4/8/2004 5:41:08 PM FW: Project Torch Impact Fees at Tradepoint Thanks for the thorough feedback Ken. This is very helpful. Can you quote us a 10" water meter instead of the 2" and 6". When we looked at this at another building, a 10" meter was required to allow the 60,000 gal/hr through the meter. We will still need the 2" irrigation meter. Thanks and have a good weekend. Albert ..... Original Message ..... From: Ken Griffin [mailto:kgriffin@ci.coppell.tx.us] Sent: Thursday, April 08, 2004 5:26 PM To: albert.jarrell@hillwood.com Subject: Re: Project Torch Impact Fees at Tradepoint Mr. Jarrell I noticed that Mr. Jones, Building Official, has responded to several of your inquiries. Hopefully this will address the remainder. The water and sewer system is adequate to support your operation at the use of 60,000 gallons per hour and the discharge of 300,000 gallons per day. I had our consultant model our water system on the peak hour with 60,000 gallons and the peak day with 1,440,000 gallons. In both cases there was very little impact to the system. The cost of water is $2.60/1000 gallons and sewer is $1.80/1000 gallons. We charge the sewer based on the water use, with no cap. However, in situations where we have a large water user returning only a portion of the water back to the system, we recommend that they meter their sewer so they are only charged for the amount returned to the system. I've attached a portion of Article 11-15 of our Code of Ordinances that discusses allowable B.O.D. I would recommend that you visit www.municode.com <http://www.municode.com> to review the entire Article 11 of our Code of Ordinances entitled "Industrial Waste and Sewer Use Regulations". I have also attached an excel worksheet that shows preliminary fees. I had to make several assumptions: 1 ) 2" domestic and 2" irrigation meter; 2) a 6" meter for the additional water (this is shown as an additional irrigation meter because our program has no other place to note an additional meter - not sure if a 6" is adequate it is a guess on my part); 3) I classified the use as "other industrial not specified" (if the use is "light industrial" only, then the roadway impact fee would be $159,000 not the $391,500 as shown - more information on the use is needed before we can make that determination). Ken Griffin- FW: Project To?h.!mpact F_ees at Tra~e?oint ...... Page 2 i I hope this information is helpful. If you need any additional information, please let me know. I will be out of the office on Friday 4/9/4 but back on Monday. Ken Griffin, P. E. Director of Engineering/Public Works >>> "Jarrell, Albert" <albert.jarrell@hillwood.com> 4/8/2004 2:41:35 PM >>> Ken, Could you also help us estimate impact fees for water, sewer, roadway, ere for this deal? You know the water and sewer usage, but I'm not sure what you need to calculate any other fees. The building would be 500,000 SF initially with 10,000 SF of office. Thanks, Albert Jarrell Development Director Hillwood Investment Properties Three Lincoln Centre 5430 LBJ Freeway, Suite 800 Dallas, Texas 75240 972.201.2971 direct 972.201.2989 fax 214.616.3153 mobile albert.jarrell@hillwood.com www.hillwoodinvestmentproperties.com www.hillwood.com CC: "Herold, Preston" <preston.herold@hillwood.com>, "Hicks, Tal" <tal.hicks@hillwood.com>, "Tatsch, Dan" <dan.tatsch@hillwood.com>, "Myhre, Clayton" <clayton.myhre@hillwood.com >