Loading...
PA9702-LR 990713CONCRETE COMPRE , IVE STRENGTH TES _ 8901 Carpenter ierwy., Suite gl00 Dalla,, Texans 75247 Date of Service: 06/14/1999 Report No.: 9916284 Report Date 07/13/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/P, ecrcation Ctr Attn: Bra~Reid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppe11, Tcxas/Prj. #96051 Services: ~btainsamp1cs~ffreshc~n~rcteatthep~a~ement1~ati~ns~p~rf~rrnrequired~e1dtestandcast compresslye strength samples. PROJECT DATA CONTRACTOR: I-[isaw & Assoc. CONCRETE CLASS: 6 Sack CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 06/14/1999 BATCH TIME: ll:44am PLANT: Lewisville TIMESAMPLED: 12:35pm EV: MikeOdom SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 85 F CONCRETE: 85 F SLUMP: 4-6" TnUC~CNO: 217 TICK~XNO: 73398 Am: N/A AIR CONTENT (%): N/A UNIT WEIGHT (Pc0: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: pier information and technician time: See Report #9916283 ASTM C-172 ASTM C-39 SAMPLE LOCATION: B.I 26, 18 REPORT OF TESTS ACCUMULATIVE YARDS: 50 CYLINDER MEASURED MAXIMUM COMPRESSWE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. {inches) TESTED (days) (Ibs. force) (psi) TYPE l 1 4.50 06/21/1999 7 112260 3970 I 2 4.50 06/21/1999 7 110950 3920 Average 3950 1 3 4.50 07/12/1999 28 155600 5500 1 4 4.50 07/12/1999 28 146800 5190 Average 5350 Technician: Mike Odom Started: 12:00pro Finished: 5:00pro H]C E~ri!!g, Inc. Report Distribution: (1) city of Coppell (1) City of Coppell - Engineering (I) BrinkIcy Sargent Architects (1) City of Coppell - Bldg. Insp. Paul D. Smith, P.E. (1) Turner Engineers (I) Ci[y of Coppe~l - Leisure Serv Dept Senior Project Engineer (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. 01LL Page 1 of I