Loading...
Dynasty Cleaners-CS030611Jun 11 03 10:39a J .P. B ROT H 15 RS INC. p.1 Jun 11 03 lO:~Oa MA International Consulting/Engineering/Planning 506 Melrose Erive Richardson, Texas 75080 Tel: 972) 644-2439 Fax: 972) 644-2414 E-Mail: ma2@maiLcom June 4, 2003 Mr. Ym g Soo Klm, President J.P. Brothers, loc. 10203 (!orkwood Pl. Suit 110 Dallas, Texas 75238 RE: St)tm Drain Revision and Cal~ ulations Dynasty Plaza - Denton Tap & 121 Coppell, Texas Mr. Kim: At your request, MA International has revised the private storm drain line due to field changes and conflicts. We recalculated for a 12" pipe and determined the ttgl matches the top ~f curb elevation and there for ,viii handle the entire run off(Q100=7.64 CFS) under p~ essure Plow. In addition we recommend that you usc ABS pipe instead of the RCP pit e since this is a private storm drain system in a private easement between the adjacen~ property owners and will be easier to install around the existing water and gas lines. 'I he calculations are attached to this letter. If you hive any questions, please call me. Thank ~ au fbr allowing us to ihrthcr a:;sists you on this project. Sincerely, MA intemational, Inc. John Mi, P.E. Presider t Cc: I Jarreth Campbell - Construction Inspector ( :ity of Coppell 3un Il 03 10:40~ p.3 ~' 3un 11 03 ~0:~0~