CF-Denton Creek Trail-CS040517 T H £ C I T Y 0 Fr
CO?P-ELL
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To'
From:
Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
Brad Reid, Director of Parks/Recreation
John Elias, Parks Operations Manager
Keith Marvin, Civil Engineer
Larry Davis, Construction Inspector
Office Phone: (972) 304-3684
Fax: (972) 304-3570
Date: May 17, 2004
RE: WALK-THRU for Denton Creek/Asbury Manor Trails
A final walk-thru for paving and drainage on the referenced project has been scheduled
for
Wednesday, May 19, 2004 at 2:00 p.m. at the Moore Rd. end of project
Please let me know if I can be of further assistance.
cc: Steve Jeske, Jeske Construction fax 972-620-9852
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"