ST9905-ES030811cOPP-ELL
August 11, 2003
JMC Restaurant Distribution, Inc.
Mr. Robert Kulick
1080 W. Bethel Road
Coppell, Texas 75019-4427
Bethel Road 1 / ST 99-05
Parcel 12 Temporary Construction Easement
Dear Mr. Kulick:
The City of Coppell is currently working with the engineering firm of TranSystems Corporation
to design Bethel Road I, from the west City limits to Freeport Parkway. The project consists of
the widening of the existing two-lane asphalt roadway to a four-lane divided roadway with
improved drainage. The project is in the final design phase and the City is in the process of
acquiring the right-of-way and easements necessary to construct the project. There are ten right-
of-way parcels, three slope easements, and fifteen temporary construction easements to be
acquired within the project limits. It will be necessary to acquire a 20- to 30-foot temporary
construction easement on property that is owned by JMC Restaurant Distribution, Inc. The
temporary construction easement will provide the contractor with sufficient work area to
construct the roadway. The temporary construction easement is not filed with Dallas County, so
there will not be a permanent encumbrance on your property associated with this easement.
With this letter I am providing a copy of the temporary construction easement documents
necessary for the construction of Bethel Road I. Please review the enclosed documents and let
me know if you have any questions or if you wish to view the construction plans. Franchise
utility relocations have started and more will begin once all of the right-of-way is acquired. It is
anticipated that construction will begin in April 2004.
Your consideration of this matter is appreciated.
Sincerely,
Suzar( T~ylor
CIP Cborktinator
972-304-7019
Enclosures