Loading...
Brighton Manor-LR040513Construction Materials Testing and Environmental Consulting Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352-6957 Fax (214) 352-6972 www .texascmt.com GENERAL REPORT May 13, 2004 Report Date Client Project Street Custom Homes Brighton Manor Test Date: May 4, 2004 General Report No.: 3 Project No.: 204-0126 At the request of Mr. Rodney Louviere, a Texas CMT technician was present on May 4, 2004 to perform in-place densities and observe gray shale backfill for utility trenches. The following observations were made: ..~1. Gray shale fragments in general were according to COG specifications, no larger than six .(6) inches. ,~,~ 2. Shale fragments were mixed with enough fines (no voids observed). ,~,~ 3. In-place densities taken met project compaction and moisture content s. pecifica~s. Technician: AB CC: