ST9905-ES031006October 6, 2003
T H E · C I T Y · 0 F
COPPELL
Hillwood Investment Properties
Albert E. Jarrell, Jr.
Three Lincoln Centre
5430 LBJ Freeway, Suite 800
Dallas, Texas 75240
RE:
Bethel Road I / Project # ST 99-05
Parcel 7E & 7E 1-Temporary Construction Easement
Parcel 7E2 - Slope Easement
Dear Mr. Jarrell:
This letter is a follow-up to the September 11, 2003 letter concerning the acquisition of right-of-
way from your property located along Bethel Road. Hillwood Fund No. 1, L.P. property is
owner of what is shown as Parcel 7 on the construction plans for the Bethel Road improvements.
In order to construct the improvements, it will be necessary to acquire right-of-way, two
temporary construction easements, and a slope easement. Hillwood Fund No. 1, LP. will dedicate
the right-of-way with the Replat of Lot 1, Block A of the Coppell Industrial Addition into Lot IR
and Lot 2, Block A of the Tradepoint Business Park. The temporary construction easements and
the slope easement will be dedicated by separate instrument. These easements are not filed with
Dallas County and will expire upon completion of the project by the City.
Construction is scheduled to start in April 2004 and we need to acquire the necessary right-of-
way as soon as possible. Enclosed are copies of the slope and temporary construction easement
documents. If you have no questions, the City of Coppell would appreciate the signing and
returning of the easement documents.
Your consideration of this matter is appreciated and should you have any questions, please
contact Suzan Taylor at 972/304-7019.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
Office 972/304-3686
Fax 972/304-7041
Enclosures