Loading...
ST9905-ES031006O~]TED F~X NO, : Gulf I~;,~ ~ring Ross R~msey 675 S RoyaJ Lane, Suite B Coppe;ll, l'exas 75019-3805 RE: Bethel Road I / Project # ST 99-05 COl'FELL I?arcel 5 - Right-of-Way ?arceI 5E - Part 1, Part 2 - Temporary Cons~uction Easement Oct. 16 2003 B3:48PM P2 RECEIVE[3 OCT - 8 2083 October 6. 2003 Dear Mr. Ramsey: This lt:lter is a follow-up to my August 11, 2003 letter concerning the acquisition of right-of-way from your property located along Bethel Road. Gulf Bearing, Inc., is owner of what is shown as Parcel 5 on the cr, n~truction plans for the Bethel Road improvements. In order to construct the improvetnen]s, it will be necessary to acquire right-of-way and two temporary construction easements from Parcel 5. The righ]- of. way is a corner clip at the inter~ection of Royal Lane and Bethel Road, and the temporary construcuon easemmts are along the south and east property lines. The City of Coppell is offering $200 per square foot for the permanent right-or-way and $0.50 per square toot fib: the temporary construction easements Temporary construction easements are typically acquired at one ?otulh the value of right-of-way. These easements are not filed with Dallas County and will expire upon completion of the project by the City. This letter constitutes ;in offer from the City of Coppcll for the acquisi~on of thc right-of-way and tempcnnry construe'ann easements a; follows: 1. Acquisition of permanent right-of-way at~.00/sq ft. x 458 sq. ft. $916.00 2. Acquisition of temporary construction easement at $0.50/sq ft. x 7,503 sq. fl. $3,751.50 3 Acquisition ot'temporary construction easemenl at $0.50/sq. ftx 695 sq. ft. $347.50 Total $5,015.00 Constr.~ction is scheduled to statl in April 2004 and we need to acquire the necessary righl-ot'-way as soon ~ possible. Enclosed are copies of the right-of-way and ~empnrary construction easemenk,~,~ documents. Yom- requested changes have been added to the language on the temporary construction ~' ea~emcnt~ If the above offer is acceptable, please sign below and return to this office. Once the letter is rec¢ivcd, thc process for payment of the $5,015.00 can start. When ]he check is ready we can arrange a munmlly agreeable time to meet and notarize the documents in exchange for the check. Your consideration of this matter is appreciated and should you have any questions, please contact Suzan TaylOr at 972/304-7019. Since ?ly, Kenneth M. Griffin, P.E. Direct,Jr of Engineering and Public Works Office 9721304-3686 Fax 932/304-7041 Gulf Bearing