Loading...
ST9905-ES030915T H E ~ C 1 T V ~ O F COPPELL r .=.~ ~`~ ,.~ c o A S 1 September l5, 2003 Dallas/Fort Worth International Airport Mr. Michael E. Pyles P.O. Box 619428 DFW Airport, Texas 7261-9428 RE: Bethel Road 1 i ST 99-0~ Parcel 4 Right-of--Way /Parcel 4E1 -Slope Easement Parcel 4E -Part 1, Part 2, Part 3 - Temporary Construction Easement Revised Legal Descriptions and Plats Dear Mr. Pyles: On August 11, 2003 I provided you a copy of the right-of-way, slope easement, and temporary construction easement documents necessary for the construction of Bethel Road I. Subsequent to that, changes were made to the legal descriptions and plats based on information provided by Mr. Mark Viktorin with the DFW Airport. Enclosed are the revised documents for your use in preparing the license agreement for the right-of-way and temporary use permits for the temporary easements. Your consideration of this matter is appreciated. Sincerely, ~ ~~~ T~t,~lc~ Suza ~ aylor CLP L`oordinator ! 972-304-7019 Enclosures 255 PIaft KWNY t P. O.BO% 998 * COPPE LL T% ~SOIY Y lEL 92//62 0022 * FA% 9]2/306 36]3