Loading...
ST9502-LR 960530CONCRETE COMPRLoSIVE STRENGTH TES 4747 Irving Blvd., Suite #206 Dall~, Texa~ 75247 Date of Service: Client No.: Client: Services: 05/30/1996 79543000 Site Concrete, Inc. Ms. Jean Boney P.O. Box 140096 Irving TX 75014-0096 Report No.: 964231 Project No.: 43-1222-96 Project: Town Center Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Contractor Made PLA~: On-Site SPECIFICATION REQUIREMENTS STRENGTH: 3600 psi ~ 28 Days 2" - 3" 4 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 1 3.0 06/27/1996 1 2 3.0 06/27/1996 PROJECT DATA CONCRE~ CLASS: N/A PLACEMF_2~ DATE: 05/30/1996 BATCH TIME: N/A TIME SAMPLED: 9:45 am BY: Zach Howard WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: N/A AIR CONTENT (%): 5.1% PLACEMENT LOCATION: Partly cloudy 79 F CONCRETE: 83 F TICKET NO: N/A trmx wmairr (~*0: N/A Paving, center of Town Center Boulevard SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS AGE LOAD (days) 0hz. force) Station 2+75 200+ COMPRESSIVE STRENGTH (~) 28 106200 3760 28 108640 3840 FRACTURE TYPE Refer to Report No. 964232 for time. Technician: Zach Howard Report Distribution: (1) Site Concrete, Inc. (1) City of Coppell Started: Finished:  ring, Inc. - Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. CONCRETE COMPRL3SIVE STRENGTH TES.' 4747 Irvln~ Blvd., Suite 0206 DnlIn% Texas 7S247 Date of Service: Client No.: Client: Services: 05/30/1996 79543000 Site Concrete, Inc. Ms. Jean Boney P.O. Box 140096 Irving TX 75014-0096 Report No.: 964231 Project No.: 43-1222-96 Project: Town Center Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** SLUMP: AIR: TEST METHOD: co~crRACrOR: Site Concrete CONCm~r~ SUPPLIER: Contractor Made PI.nm': On-Site SPECIFICATION REQUIREMENTS STRENGTH: 3600 psi ~ 28 Days 2" - 3" 4 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 2 ! 3.25 06/27/1996 2 2 3.25 06/27/1996 PROJECT DATA CONCP~TE CLASS: N/A PLACEMENT DATE: 05/30/1996 BATCH T~'V~E: N/A TIME SAMPLED: 11:25 am BY: ZachHoward WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: N/A /da CONTV.~rr (./.): 4.7% PLACEMENT LOCATION: Partly cloudy 88 F CONCRETE: 86 F TICKET NO: N/A UNIT WmGIrr (pc0: N/A Paving, center of Town Center Boulevard SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS AGE LOAD (days) Obs. force) Station 2+65 200+ COMPRESSIVE STRENGTH (ps0 28 109620 3880 28 116030 4100 FRACTURE TYPE Refer to Report No. 964232 for time. Technician: Zach Howard Report Distribution: (1) Site Concrete, Inc. (1) City of Coppell Started: Finished: I-~~g, Inc. Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.