ST9905-ES030821T H E; · C I T Y · 0 F COPPELL August 21, 2003 Fellowship of Las Colinas 2450 S.H. 121 South Grapevine, Texas 76051 RE: Bethel Road I / ST 99-05 Parcel 1 - Right-of-Way Parcel 1E -Temporary Construction Easement Dear Sir: The City of Coppell is currently working with the engineering finn of TranSystems Corporation to design Bethel Road 1, from the west City limits to Freeport Parkway. The project consists of the widening of the existing two-lane asphalt roadway to a four-lane divided roadway with improved drainage. The project is tn the final design phase and the City is tn the process of acqmring the right-of-way and easements necessary to construct the project. There are ten right- of-way parcels, three slope easements, and fifteen temporary construction easements to be acquired within the project limits. It will be necessary to acquire right-of-way and a 10- to 15- foot temporary construction easement on property that is owned by the Fellowship of Las Colinas. A minimum right-of-way width of 90 feet is required for a four-lane divided roadway. The existing right-of-way in the vicimty of your property is 45 to 50 feet. The temporary construction easement will provide the contractor with sufficient work area to construct the roadway. The temporary construction easement is not filed with Dallas County, so there will not be a permanent encumbrance on your property associated with this easement. With this letter I am providing a copy of the right-of-way and temporary construction eascmcnt documents necessary for the construction of Bethel Road I. Please rewew the enclosed documents and let me know' if you have any questions or if you wish to wew thc construction plans. Franchise utility relocations have started and more will bcg~n once all of the right-of-way is acquired. It is anticipated that construction will begin in April 2004. Your consideration of this matter is appreciated. Sincerely, Suzan '!~ylor CiP CoOdinator 972-304-7019 Enclosures T H E C I T Y 0 COl'FELL August 11, 2003 Fellowship of Las ~ '~l~l_l-o o,1%141'~ P-.lq IA 3501 N. MacA~r Boulevard 2,q.~O %14 12.1 Suite 50~1.~'~ I~}g~ Texas 75062-3636 C"~O~'~ I Iq s: '~ Bethel Road I / ST 99-05 Parcel 1 - Right-of-Way Parcel 1E -Temporary Construction Easement Dear Sir: The City of Coppell is currently working with the engineering firm of TranSystems Corporation to design Bethel Road I, from the west City ]/mits to Freeport Parkway. The project consists of the widening of the existing two-lane asphalt roadway to a four-lane divided roadway with improved drainage. The project is in the final design phase and the City is in the process of acquiring the right-of-way and easements necessary to construct the project. There are ten right- of-way parcels, three slope easements, and fifteen temporary construction easements to be acquired within the project limits. It will be necessary to acquire right-of-way and a I0- to 15- foot temporary construction easement on property that is oxvned by the Fellowship of Las Colinas. A minimum right-of-way width of 90 feet is required for a four-lane divided roadway. The existing right-of-way in the vicinity of your property is 45 to 50 feet. The temporary construction easement will provide the contractor with sufficient work area to construct the roadway. The temporary construction easement is not filed with Dallas County, so there will not be a permanent encumbrance on your property associated with this easement. With this letter I am providing a copy of the right-of-~vay and temporary construction easement documents necessary for the construction of Bethel Road I. Please review the enclosed documents and let me know if you have any questions or tf you wish to view the construction plans. Franchise utility relocations have started and more will begin once all of the right-of-way Is acquired. It is anticipated that construction will begin in April 2004. Your consideration of this matter is appreciated. Sincerely, Suza~ yaylor CIPC~ordinator 972-304-7019 El~closures