Vista Point II-CS031222 T H E ¢ I T Y 0 F
COPPELL
P.O. Box 9478
255 Parkway Blvd
Coppell, TX 75019
Phone: (972)304-3686
Fax: (972)304-7041
ENGINEERING DEPARTMENT
FAX COVER SHEET
To: Eric Helwig From: Ken Griffin, P. E., Director of Engineering
Fax#: 720-529-2841 Date: 12/22/03
Phone #: Pages: 9 (includtng cover sheet)
Re: Vista Point II, MacArthur Ridge CC:
Service Star
( ) Urgent ( ) For Review ( ) Please Comment ( ) Please Reply ( ) As Requested
Comments:
Mr. Helwig,
As requested, I have provided a preliminary estimate of the Engineering development fees
that we can calculate at this time. The water line layout with the plat shows that the fire
protection is provided with an internal looped private water line. I made an assumption
that each development would be responsible for one tim meter and vault. The actual fee
calculation could change based on how the water line is designed and constructed/phased.
The construction inspection fees can not be calculated until a cost is submitted for all work
to be inspected by Engineering. This typically includes all work outside the footprint of
the building, ie., paving, water and sewer lines, driveways, etc.
These calculations do not include any cost or fees associated with the building permit or
inspection of the building. You should contact building inspections for those costs.
Ken Griffin
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3686
"City of Coppell Engineering- Excellence By Design"
DEVELOPMENT FEE TABLE
Project: Vista Point II, MacArthur Ridge (store, service station) Preliminary
Date: 12/22/2005
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $2,800.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $138.60
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $2,046.30
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $1,400.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(I 00% due prior to Council Approval)
Roadway Impact Fee $2,615.60 $2,615.60
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) I[
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) I[
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction) l]
tOTAL $9,340.50
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $2,615.60
DEVELOPMENT FEE WORKSHEET
PROJECT: Vista Point II, MacArthur Ridge (store, service station) Preliminary
DATE: 12/22/2003
Water Impact Fee:
Domestic Meter(s): 1 - 1 1/2 inch = 5 ESU's
Irrigation Meter(s): 1 - 1 inch = 2.5 ESU's
0 = 0 ESU's
Fireline Meter(s): 1 - 8 inch = 2~5 ESU's
Total #: 10 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $138.60
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $61.80
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 1 Fireline Meter(s) @ $1,984.50
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 5
(Due prior to issuance of building permit)
@$280.00 ea.
Wastewater Tap Inspection Fee:
Total #: I Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$2,800.00
$150.00
$138.60
$61.80
$o.oo
$1,984.50
$30.00
$60.00
$1,400.00
$50.00
$50.00
Page1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only): * Preliminary plat approved:
o
0
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
$0.00
$0.00
$2,615.60
Information not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Vista Point 11, MacArthur Ridge (store, service station) Preliminary
12/22/2003
ROADWAY IMPACT FEE:
Service Area * 2
Category ** Commercial
Land Use ** Convenience Store; >2400 Sq. Ft.
Building Area (sf) 3,182
Development Units * * 3.18
Vehicle Miles per Development Unit ** 2.74
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $2,615.60
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
DEVELOPMENT FEE TABLE
Project: Vista Point II, MacArthur Ridge (great american) Preliminary
Date: 12/22/2005
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $2,100.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $61.80
(100% due at Issuance of Water Meter)
Water Meter Fee (lrrigation/Fireline) $2,046.30
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
lrrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $700.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $8,505.17 $8,505.17
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
FOTAL $13,753.27
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $8,505.17
DEVELOPMENT FEE WORKSHEET
PROJECT: Vista Point II, MacArthur Ridge (great american) Preliminary
DATE: 12/22/2003
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 1 inch 2.5 ESU's
1 - 1 inch 2.5 ESU's
0 = 0 ESU's
1 - 8 inch 2.5 ESU's
Total #: 7.5 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $61.80
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
lrrigation/Fireline Water Meter Fee:
Total #: I Irrigation Meter(s) @ $61.80
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 1 Fireline Meter(s) @ $1,984.50
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 2.5
(Due prior to issuance of building permit)
@ $280.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$2,100.00
$150.00
$61.80
$61.80
$o.oo
$1,984.50
$30.00
$60.00
$700.00
$50.00
$50.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only): * Preliminary plat approved:
0
0
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
$0.00
$0.00
$8,505.17
Information not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction
Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Vista Point I1, MacArthur Ridge (great american) Preliminary
12/22/2003
ROADWAY IMPACT FEE:
Service Area * 2
Category ** Commercial
Land Use ** Commercial Others Not Specified
Building Area (sf) 5,956
Development Units ** 5.96
Vehicle Miles per Development Unit ** 4.76
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) $8,505.17
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)