SS0201-CS040518T H E C I T Y O F
COl'FELL
May 18, 2004
Mr. David Dryden
Rone Engineers
8908 Ambassador Row
Dallas, Texas 75247
Service Center Sanitary Sewer Line
SS 02-01
Construction Materials Testing
Dear Mr. Dryden:
Enclosed please find a set of plans and specifications for the above referenced project.
The project consists of the installation of approximately 1800 linear feet of 18-inch PVC
sanitary sewer line at depths of up to 18 feet. There is an aerial crossing with 6 - 18-inch
diameter reinforced concrete piers and a road bore under Coppell Road. It is anticipated
that construction will begin in June 2004.
Please provide an estimate of the type and number of construction materials tests required
for the project based on the construction plans and the City's standards and submit a
proposal for the testing. The contractor is responsible for payment of materials testing
done before 8:00 a.m. and after 5:00 p.m.
Your consideration of this matter is appreciated and should you have any questions or
need any additional information, please contact me at 972-304-7019.
Sincerely,
SuzmfOk Taylor
C.I.Pi COordinator
Enclosures