Loading...
SS0201-CS040518T H E C I T Y O F COl'FELL May 18, 2004 Mr. David Dryden Rone Engineers 8908 Ambassador Row Dallas, Texas 75247 Service Center Sanitary Sewer Line SS 02-01 Construction Materials Testing Dear Mr. Dryden: Enclosed please find a set of plans and specifications for the above referenced project. The project consists of the installation of approximately 1800 linear feet of 18-inch PVC sanitary sewer line at depths of up to 18 feet. There is an aerial crossing with 6 - 18-inch diameter reinforced concrete piers and a road bore under Coppell Road. It is anticipated that construction will begin in June 2004. Please provide an estimate of the type and number of construction materials tests required for the project based on the construction plans and the City's standards and submit a proposal for the testing. The contractor is responsible for payment of materials testing done before 8:00 a.m. and after 5:00 p.m. Your consideration of this matter is appreciated and should you have any questions or need any additional information, please contact me at 972-304-7019. Sincerely, SuzmfOk Taylor C.I.Pi COordinator Enclosures